Citas bibligráficas
Gonzales, A., (2019). Evaluación y simulación dinámica del sistema de captación de aguas subterráneas por bombeo, en la ciudad de Puerto Malabrigo, distrito Razuri, provincia Ascope [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/5552
Gonzales, A., Evaluación y simulación dinámica del sistema de captación de aguas subterráneas por bombeo, en la ciudad de Puerto Malabrigo, distrito Razuri, provincia Ascope [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2019. https://hdl.handle.net/20.500.12759/5552
@misc{renati/377967,
title = "Evaluación y simulación dinámica del sistema de captación de aguas subterráneas por bombeo, en la ciudad de Puerto Malabrigo, distrito Razuri, provincia Ascope",
author = "Gonzales Anticona, Aldrin Ceulemans",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2019"
}
Currently the city of Puerto Malabrigo in the district of Razuri in the province Ascope of the department La Libertad, suffers from a severe shortage of drinking water, the endowment is made on average three days a week, with a period of duration of 1 to 3 hours per day of service. Likewise, the source of collection is a pumping system with a production of less than the required flow. This thesis arises from the need to provide a solution to the shortage of drinking water that the city suffers for more than 30 years, as part of the social contribution to be made by the Universidad Privada Antenor Orrego (UPAO). I offer my project to the city to make a small contribution (alternative solution) to the emblematic problem of the city that is drinking water. The purpose of the thesis is that this town can be supplied 24 hours a day with drinking water, for this I propose a design of suction line and new drive. The thesis guarantees that the water from the underground catchment arrives with a favourable dynamic pressure. Therefore, in the present investigation it was possible to evaluate and dynamically simulate the groundwater collection system by pumping in the town of Puerto Malabrigo, determining the groundwater pumping flow, diameter of the suction and impulsion line pipe, number of pumping hours per day, total dynamic height and power of the required pump. For this purpose, the design period, the design population, staff per inhabitant and the average flow rate were determined. With the average flow we proceeded to calculate the daily maximum flow, hourly and pumping, with these data we calculated the diameter of the pipeline for the suction and impulsion line, a calculation was made to determine the loss of hydraulic load, and total dynamic height. With these data, the minimum power of the pump required to perform the function of pumping groundwater was calculated.
IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.