Bibliographic citations
Delgado, E., Rodriguez, R. (2018). Aplicación de la tecnología BIM en el proyecto conjunto residencial Rafaela II para la disminución de costos operativos, Trujillo - La Libertad [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/4452
Delgado, E., Rodriguez, R. Aplicación de la tecnología BIM en el proyecto conjunto residencial Rafaela II para la disminución de costos operativos, Trujillo - La Libertad [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2018. https://hdl.handle.net/20.500.12759/4452
@misc{renati/377289,
title = "Aplicación de la tecnología BIM en el proyecto conjunto residencial Rafaela II para la disminución de costos operativos, Trujillo - La Libertad",
author = "Rodriguez Gonzales, Raúl Eduardo",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2018"
}
This thesis is focused on the branch project management for their development data have been collected, dare modeling done are Revit and Naviswork software and surveys depth in the work Residential Rafaela II, a project implemented by the company COAM contractors. Because in building projects, developed by the traditional delivery model projects Design / Bid / Build, design documents and engineering are made in the design stage by architects, consultants and designers engineering, playing an important role in construction projects since moving the needs and requirements of the customer drawings and specifications. These documents, containing all the information necessary to carry out the construction, are the basis for the bidding process and subsequently delivered to the contractor as official documents to begin execution. So ideally contractual documents of the construction project should be complete, accurate, without conflicts and ambiguities, but unfortunately this is rarely encountered and very often the contractor begins construction with incompatible, incorrect or incomplete documents, requiring, therefore clarifications that have to be answered by the designers and designers in the building process. When this is the case, it is essential that information is delivered to the contractor efficiently and without delay, otherwise it could affect the efficiency during project development.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.