Look-up in Google Scholar
Full metadata record
Vargas Cardenas, Carlos Manuel (spa)
De la Cruz Fiestas, Junior Francisco (spa)
Neira Mendez, Sarita Evelin (spa)
De la Cruz Fiestas, Junior Francisco (spa)
2016-10-21T16:19:48Z
2016-10-21T16:19:48Z
2016
https://hdl.handle.net/20.500.12759/1988 (eng)
El presente trabajo tuvo como principal objetivo disminuir los costos operativos en por lo menos 5% de las obras de mediana altura del distrito de Trujillo 2015. Por medio del método a juicio de expertos obtuvimos que la mejor construcción de mediana altura que se adecuaba al mejor y practico utilización de la metodología es edificio Residencial PARQUE III .A partir de entrevistas a profundidad realizadas a la encargada del área logística y al residente de obra, se recolecto los datos necesarios para determinar el proceso logístico que realizaba la empresa antes mencionada, también se realizó observaciones directas en obra, en la que se pudo observar el proceso de suministro que realiza la empresa. Para el desarrollo de la tesis se uso la metodología Last Planner System® sus aspectos teóricos fueron desarrollados y estudiados a lo largo de la tesis. En base a los cuales se planteó una metodología de implementación que se aplicó por un período de 9 semanas y 2 días. Los resultados obtenidos nos demuestran la importancia del compromiso del equipo de obra y del soporte de la empresa para la implementación. De esta forma se identificaron diversos desafíos que se enfrentan al realizar una implementación de este tipo y la retroalimentación que el propio sistema genera para la mejora continua. Los resultados obtenidos para la mejora del proceso Logístico producto de la aplicación del Last Planner System (Sistema del Último Planificador), significo un ahorro del 23.70% comparado los costos operativos del proceso logístico tradicional de la empresa en estudio con los costos operativos del proceso logístico de nuestra propuesta. (spa)
This work had as main objective to lower operating costs by at least 5% of the works of medium altitude of the District of Trujillo 2015. By means of the method experts got the better construction of mid-rise that it complied with the best and practical use of the methodology is building residential Parque III. From in-depth interviews taken charge of the logistics area and the resident's work, the necessary data is collected to determine the logistics process that made the company referred to above, also held direct observations in work, in which the process of delivery that the company could be observed. The Last Planner System ® methodology was used for the development of the thesis theoretical aspects were developed and studied throughout the thesis. On the basis of which arose a deployment methodology that was applied for a period of 9 weeks and 2 days. The results obtained show us the importance of the commitment of the team work and the support of the company for the implementation. In this way identified various challenges faced by performing a deployment of this type and the feedback generated by the system for continuous improvement. The results obtained for the improvement of the process logistics product from the application of the Last Planner System (Sistema del ultimo planificador), I mean a saving of the 23.70% compared the operating costs of the traditional logistics process from the company in study with the operating costs of the logistics process of our proposal. With the implementation of the proposal and a suitable management, ensures a better control of the materials, and the reduction of operating costs, and with proper application the company “Negocios e Inversiones (eng)
Tesis (spa)
application/pdf (eng)
spa (spa)
Universidad Privada Antenor Orrego - UPAO (spa)
T_ING.CIVIL_1331
info:eu-repo/semantics/openAccess (spa)
Universidad Privada Antenor Orrego (spa)
Repositorio Institucional - UPAO (spa)
Metodología Last Planner System (spa)
Costos operativos (spa)
Aplicación de la metodología Last Planner System en la cadena de suministros para la disminución de costos operativos en obras de edificación de mediana altura en el distrito de Trujillo 2015 (spa)
info:eu-repo/semantics/bachelorThesis (eng)
Universidad Privada Antenor Orrego. Facultad de Ingeniería (spa)
Ingeniería Civil (spa)
Título Profesional (spa)
Ingeniero Civil (spa)
Privada asociativa



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.