Burga, C., Cuadros, T. (2016). Aplicación de un sistema logístico utilizando Last Planner System® incrementando la rentabilidad operativa del Edificio Multifamiliar Los Claveles de la Empresa Constructora Representaciones Daca S.A.C. [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/2043
Burga, C., Cuadros, T. Aplicación de un sistema logístico utilizando Last Planner System® incrementando la rentabilidad operativa del Edificio Multifamiliar Los Claveles de la Empresa Constructora Representaciones Daca S.A.C. [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2016. https://hdl.handle.net/20.500.12759/2043
@misc{renati/375629,
title = "Aplicación de un sistema logístico utilizando Last Planner System® incrementando la rentabilidad operativa del Edificio Multifamiliar Los Claveles de la Empresa Constructora Representaciones Daca S.A.C.",
author = "Cuadros Valverde, Tathiana Vanessa",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2016"
}
This thesis has as main purpose to help improve the logistics system working on a proposal to increase the operating profitability Empresa Constructora Representaciones Daca S.A.C. From depth interviews logisticians to the area and the building supervisor of the ““Edificio Multifamiliar Los Claveles““, the necessary data was collected to determine the logistics process being conducted by the aforementioned company, direct observations were also made on site, in which I ask to observe the whole construction process undertaken by the company. For the development of the thesis the Last Planner System ® (Last Planner System) methodology Lean Construction philosophy (Construction lossless) was used, making a segmentation of 3 to 7 floor of Edificio Los Claveles , and then formulate trains activities and based on this the Lookahead of materials and production was developed. On the basis of these results and the data obtained from the company they developed the Lead Time (time supply), with which you can know the dates on which orders can be made of materials and avoid increased project costs and the company. The results for the improvement of logistics processes resulting from the application of the Last Planner System (Last Planning System), mean a saving of 45% compared to the costs of traditional enterprise logistics process in studio with logistics costs of our process proposal. With the implementation of the proposal and appropriate management ensures better control of materials, and reduced logistics costs, and proper application Empresa Constructora Representaciones Daca S.A.C will have higher profits, thus creating a competitive advantage.