Vargas Cárdenas, Carlos Manuel (spa)
García Coronado, Brenda Ingrid (spa)
Ruiz Fernández, Erickson (spa)
García Coronado, Brenda Ingrid (spa)
2015-10-06T16:20:55Z
2015-10-06T16:20:55Z
2015
https://hdl.handle.net/20.500.12759/1144 (eng)
Esta Tesis tiene como propósito fundamental de ayudar a mejorar la gestión de obras civiles elaborando una propuesta de mejora de costos, recursos y tiempo de la empresa COAM CONTRATISTAS SAC. A partir de la toma de datos en obra realizadas en la obra “Residencial Mostacero”, se recolectó los datos necesarios para determinar el proceso operativo que realizaba la empresa antes mencionada, también se realizó una entrevista con el ingeniero encargado de la obra antes mencionada, en la que se pudo observar el proceso constructivo que realiza la empresa. Para el desarrollo de la tesis se programó mediante cadena crítica la obra civil de 3 pisos, para luego elaborar los cuadros de restricciones y cuadros de costos de las actividades; teniendo como base la programación de la empresa (ruta crítica) y sus costos; se elaboraron los cuadros comparativos de tiempos y costos, con los que se puede saber las ganancias de tiempo y costos en la empresa y evitar el incremento de los costos y tiempo. Con la implementación de una adecuada gestión, se garantiza un mejor control, y la disminución de los costos operativos de la empresa COAM CONTRATISTAS SAC, la cual tendrá mayores beneficios, generando así una ventaja competitiva. (spa)
This thesis has as main purpose to help improve the management of civil works drafting a proposal to improve costs, resources and time of the company COAM CONTRACTORS SAC. From the collection of data on work performed in the play “Residential Mostacero“, the necessary data was collected to determine the operational process performing the aforementioned company, an interview with the engineer in charge of the work above was also performed in which we observed the construction process performed by the company. For the development of the thesis was programmed using critical chain civil engineering 3 story, then draw boxes and boxes restrictions activity costs; programming on the basis of the company (critical path) and their cost; Comparative costs and time frames were developed, with which you can know the time and cost gains in the company and avoid increasing costs and time. With the implementation and proper management ensures better control, and lower operating costs of the company COAM CONTRACTORS SAC, which will have higher profits, thus creating a competitive advantage. (eng)
Tesis (spa)
application/pdf (eng)
spa (spa)
Universidad Privada Antenor Orrego - UPAO (spa)
info:eu-repo/semantics/openAccess (eng)
Universidad Privada Antenor Orrego (spa)
Repositorio Institucional - UPAO (spa)
Gestión en obra (spa)
Cadena crítica (spa)
Construcción civil (spa)
Residencial Mostacero (spa)
Impacto de la gestión en obra utilizando la programación de la cadena crítica en la construcción civil “Residencial Mostacero” en el distrito de Trujillo, ciudad de Trujillo, departamento La Libertad (spa)
info:eu-repo/semantics/bachelorThesis (eng)
Universidad Privada Antenor Orrego. Facultad de Ingeniería (spa)
Ingeniería Civil (spa)
Título Profesional (spa)
Ingeniero Civil (spa)