El presente trabajo tuvo como objetivo establecer una gestión de proyectos para reducir los riesgos de accidentes y así las dificultades de interacción con los obreros sea menor en el caso de la ejecución del mantenimiento de la laguna de oxidación que se encuentra ubicada en Zorritos, Tumbes. De esa manera poder cumplir con este objetivo se desarrolló la gestión de proyectos tomando diversas consideraciones, primero se realizó una identificación de los riesgos encontrados de los cuales se consideraron los más frecuentes y se podría decir que sobresalientas en obras de mantenimiento de aguas residuales, así mismo se logró identificar las causas que provocan que cada uno de ellos se convierta en un riesgo, se elaboró de acuerdo al campo de aplicación, un equipo de trabajo, para lo cual fue indispensable realizar un plan de trabajo donde se determinaron los riegos, para poder organizar la gestión de riesgos y dando responsabilidades a los trabajadores de acuerdo a su cargo, pasando a identificar los riegos de cada una de las actividades, planteando ideas de solución para que de esa manera se puedan prevenir, finalmente se llevó a cabo la elaboración de medidas de control para de esa manera reducir los riesgos. Como resultado final se logró obtener una propuesta de gestión que cumpla con todos los objetivos planteados, logrando reducir de manera óptima los incidentes ocurridos en el centro de trabajo en obra. (spa)
The present work had as objective to establish a project management to reduce the risks of accidents in the case of the execution of the maintenance of the oxidation lagoon that is located in Zorritos, Tumbes. In this way, to be able to meet this objective, project management was developed taking various considerations, first an identification of the risks found was carried out, of which the most frequent were considered and it could be said that they stand out in wastewater maintenance works, as well as It was possible to identify the causes that cause each of them to become a risk, a work team was prepared according to the field of application, for which it was essential to carry out a work plan where the risks were determined, to to be able to organize risk management and giving responsibilities to the workers according to their position, going on to identify the risks of each of the activities, proposed solution ideas so that they can be prevented, finally the elaboration was carried out control measures to reduce risks. As a final result, it was possible to obtain a management proposal that meets all the objectives set, managing to optimally reduce accidents that occurred in the work center on site (eng)
Tesis (spa)
application/pdf (eng)
spa (spa)
Universidad Privada Antenor Orrego (spa)
T_CIV_2323
info:eu-repo/semantics/closedAccess (eng)
https://creativecommons.org/licenses/by/4.0/
Universidad Privada Antenor Orrego (spa)
Repositorio Institucional - UPAO (spa)
Gestión de Proyectos (spa)
Reducción de Riesgos (spa)
Gestión de Proyectos para reducir los riesgos de accidentes en el mantenimiento de Laguna de Oxidación – Zorritos – Tumbes (spa)
info:eu-repo/semantics/bachelorThesis (eng)
Universidad Privada Antenor Orrego. Faculdad de Ingeniería (spa)
Ingeniería Civil (spa)
Ingeniero Civil (spa)
PE (spa)
http://purl.org/pe-repo/ocde/ford#2.01.00
http://purl.org/pe-repo/renati/level#tituloProfesional (eng)
18112316
https://orcid.org/0000-0001-9168-8258
72228409
72077521
732016
Merino Martínez, Marcelo (spa)
Gálvez Paredes, José (spa)
Chuquilin Delgado, María (spa)
http://purl.org/pe-repo/renati/type#tesis (eng)
Privada asociativa



This item is licensed under a Creative Commons License Creative Commons