Cabanillas Quiroz, Guillermo Juan (spa)
Chavez Chacon, Jose Lito (spa)
Chavez Chacon, Jose Lito (spa)
2021-01-27T01:30:42Z
2021-01-27T01:30:42Z
2021
https://hdl.handle.net/20.500.12759/7113 (eng)
El desarrollo de esta tesis está enfocada principalmente en la elaboración de una propuesta de planeación de la Gestión del cronograma y costos con el uso del PMBOK sexta edición, para la construcción de una obra de saneamiento básico con biodigestores, proyecto de saneamiento localizado en la provincia de San Miguel del departamento de Cajamarca. El proyecto consiste en la construcción de 831 unidades básico de saneamiento (letrina con arrastre hidráulico con biodigestor para el tratamiento de excretas). En la parte primera se basa en describir el problema real, donde podemos precisar que no contamos con herramientas que ayuden a llevar un control de la ejecución del Proyecto desde el inicio hasta el final. Se justifica pues mediante este estudio se va a desarrollar un plan de gestión tomando como base los conocimientos PMBOK, basados principalmente en dos conocimientos (cronograma y costo), se buscará hacer comparaciones con el método del valor ganado, realización de un cronograma mediante el Microsoft Project, esta propuesta servirá para obras similares, para que así puedan tener un mejor control en la dirección de proyectos basado en el cronograma y costos. Se tiene el Objetivo principal y secundarios que se basa principalmente en desarrollar un plan de gestión del cronograma y costos en la ejecución de la obra de saneamiento con biodigestores de la zona rural de la Provincia de San Miguel. El marco teórico está desarrollado a través de los conocimientos del PMBOK. Por último, la metodología a usar será mediante el levantamiento de información en las 10 localidades donde se ejecutó la obra y análisis documental Bibliográfico sobre Project Management Institute (PMBOK). Finalmente, el proyecto nos conduce a una optimización del trabajo, sin afectar la rentabilidad del proyecto el tiempo de ejecución la obra, cumpliendo con los requisitos de buena Gestión de Proyectos. (spa)
The development of this thesis is mainly focused on the elaboration of a planning proposal for the management of the schedule and costs with the use of the sixth edition PMBOK, for the construction of a basic sanitation work with biodigesters, a sanitation project located in the province from San Miguel of the department of Cajamarca. The project involves the construction of 831 basic sanitation units (latrine with hydraulic drag with biodigester for excreta treatment). In the first part it is based on describing the real problem, where we can specify that we do not have tools that help to keep track of the execution of the Project from the beginning to the end. It is justified because through this study a management plan will be developed based on PMBOK knowledge, based mainly on two knowledge (schedule and cost), it will seek to make comparisons with the method of earned value, making a schedule through Microsoft Project, this proposal will serve for similar works, so that they can have better control in the direction of projects based on the schedule and costs. The main and secondary Objective is based, which is mainly based on developing a schedule of management of the schedule and costs in the execution of the sanitation work with biodigesters in the rural area of the Province of San Miguel. The theoretical framework is developed through the knowledge of PMBOK. Finally, the methodology to be used will be through the collection of information in the 10 locations where the work was carried out and Bibliographic documentary analysis on Project Management Institute (PMBOK). Finally, the project leads us to an optimization of the work, without affecting the profitability of the project the execution time of the work, complying with the requirements of good Project Management. (eng)
Tesis (spa)
application/pdf (eng)
spa (spa)
Universidad Privada Antenor Orrego - UPAO (spa)
T_INGE_123
info:eu-repo/semantics/closedAccess (eng)
Universidad Privada Antenor Orrego (spa)
Repositorio Institucional - UPAO (spa)
Cronograma y costo de saneamiento (spa)
Biodigestores (spa)
Desarrollo del cronograma y costo del saneamiento en la zona rural con biodigestores en diez localidades de la provincia de San Miguel - Cajamarca (spa)
info:eu-repo/semantics/masterThesis (eng)
Universidad Privada Antenor Orrego. Escuela de Postgrado (spa)
Maestría en Gerencia de la Construcción Moderna (spa)
Maestro en Gerencia de la Construcción Moderna (spa)
PE (spa)
http://purl.org/pe-repo/ocde/ford#2.01.03 (spa)
http://purl.org/pe-repo/renati/nivel#maestro (spa)
47057165
732207
http://purl.org/pe-repo/renati/type#tesis (spa)
Privada asociativa



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.