García, J., (2024). Diseño estructural del pavimento articulado para la pavimentación de la avenida Progreso de la localidad de Chicama, provincia de Ascope, La Libertad - 2023 [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/18231
García, J., Diseño estructural del pavimento articulado para la pavimentación de la avenida Progreso de la localidad de Chicama, provincia de Ascope, La Libertad - 2023 [Tesis]. PE: Universidad Privada Antenor Orrego; 2024. https://hdl.handle.net/20.500.12759/18231
@misc{renati/371538,
title = "Diseño estructural del pavimento articulado para la pavimentación de la avenida Progreso de la localidad de Chicama, provincia de Ascope, La Libertad - 2023",
author = "García Vigo, Jeferson Michel",
publisher = "Universidad Privada Antenor Orrego",
year = "2024"
}
The research carried out proposes to carry out a structural design of articulated pavement for the urban road of Avenida Progreso, located in the town of Chicama, province of Ascope, with the purpose of providing a solution to a social problem that has existed for several decades and has not been does everything possible to resolve it, in addition to promoting the development and quality of life of the local residents. To obtain the correct structural design of the articulated pavement of Progreso Avenue, the AASHTO 93 methodology has been applied, in the same way the guidelines and standards indicated by the National Building Regulations were followed: CE Standard. 010 Urban Pavements, CE Standard. 030 Special and Complementary Works, CE. 040 Storm drainage, which made it possible to determine the thicknesses required for each of the layers of the articulated pavement, the storm drainage system and the signaling and bicycle lane systems of the urban road. Therefore, considering a 20-year projection of vehicular traffic, characteristics of the area's soil and its topography, it was determined that the optimal structure of the articulated pavement for Progreso Avenue corresponds to a 6 cm rolling surface (paving stone), with a 4cm sand base and a 10cm base folder; In addition, the storm drainage system was designed in which rainwater will be collected to be evacuated to the Chicama River, completing the paving of the avenue with the complementary works of signage and delimitation of cycle paths