Andrade, T., Galindos, L. (2023). Análisis de la productividad en la obra de reconstrucción del local escolar N° 2306 Sol Naciente Mediante la Guía PMBOK Trujillo-2021 [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/11010
Andrade, T., Galindos, L. Análisis de la productividad en la obra de reconstrucción del local escolar N° 2306 Sol Naciente Mediante la Guía PMBOK Trujillo-2021 [Tesis]. PE: Universidad Privada Antenor Orrego; 2023. https://hdl.handle.net/20.500.12759/11010
@misc{renati/371494,
title = "Análisis de la productividad en la obra de reconstrucción del local escolar N° 2306 Sol Naciente Mediante la Guía PMBOK Trujillo-2021",
author = "Galindos Pino, Luz Anais",
publisher = "Universidad Privada Antenor Orrego",
year = "2023"
}
The elaboration of the present thesis is entitled: ““ANALYSIS OF PRODUCTIVITY IN THE WORK OF RECONSTRUCTION OF THE SCHOOL LOCAL N°2306 SOL NACIENTE BY MEANS OF THE GUIDE PMBOK TRUJILLO-2022““, seeking to prioritize the elaboration of this analysis through the guidelines established by the PMBOK guide, which is based on a planning during the work process as well as it shows us that it is divided into management groups of knowledge areas and groups of project management processes, which thanks to the interaction of these, achieve the objectives of continuous improvement in the course of the study, emphasizing the development of management plans that will help to meet the physical goals of the project. The main objective is to analyze productivity and propose time, control and cost in works using the PMBOK guide in ““the areas of knowledge of quality management and project schedule management““ through a qualitative analysis in the technical file of the Reconstruction of School Building No. 2306 Sol Naciente, a high risk was identified in the budget due to the fact that the amounts granted by the entity do not amount to 9% of the budget amounts requested by the client and that due to this it harms the production on site, on the other hand for the established schedule a minimum risk factor of 7% is obtained, which does not affect in terms of time to complete the project. Finally, for this investigation, the method used was the descriptive-non-experimental type, applying observation and analysis research techniques in order to be a proposal for the benefit of project management, and to determine the possible causes that originate the delay. in a project and therefore a longer period of time than scheduled.