Altamirano, S., (2023). Planificación con herramientas last planner system para la ejecución de infraestructura en la universidad nacional de Jaén – Cajamarca [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/10641
Altamirano, S., Planificación con herramientas last planner system para la ejecución de infraestructura en la universidad nacional de Jaén – Cajamarca [Tesis]. PE: Universidad Privada Antenor Orrego - UPAO; 2023. https://hdl.handle.net/20.500.12759/10641
@mastersthesis{renati/371095,
title = "Planificación con herramientas last planner system para la ejecución de infraestructura en la universidad nacional de Jaén – Cajamarca",
author = "Altamirano Requejo, Sarita Yobany",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2023"
}
For the development of this research, the main objective was to plan the use of Last Planner System tools for the execution of infrastructure at the National University of Jaén - Cajamarca; the type of research to be carried out is descriptive and the study design is documentary; As tools to be used, the technical file was reviewed and analyzed, then it was detailed by means of files and formats, considering the structuring of the variables; which specifies to use the tools of the Last Planner System methodology, for this reason the master plan was formulated considering the specific structuring of the items, then the phase schedule was carried out, complemented with the sectorization techniques that allowed dividing the distribution area into 4 sectors and the metrados for each sector were equally divided, the train of activities was also formulated, being of great help to program the times required for each activity to be executed, based on the codifications of the train of activities, the intermediate plan or Look ahead, allowing to create the restrictions that can be generated in the work plan, with all the data obtained, the weekly plan was created detailing the percentages of progress executed and finally the PPC (Percentage of Plan Fulfilled) was formulated, which were important to control the commitments assumed by those responsible for each activity to be carried out. It was evidenced that, with the application of the planned tools, significant results were achieved; allowing to optimize times and improve productivity in construction processes.