Bibliographic citations
Moyano, K., Ventura, J. (2019). Evaluación de la aplicación del last planner system en la construcción de edificios multifamiliares, en Trujillo, la libertad [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/4620
Moyano, K., Ventura, J. Evaluación de la aplicación del last planner system en la construcción de edificios multifamiliares, en Trujillo, la libertad [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2019. https://hdl.handle.net/20.500.12759/4620
@misc{renati/371065,
title = "Evaluación de la aplicación del last planner system en la construcción de edificios multifamiliares, en Trujillo, la libertad",
author = "Ventura Inga, Jackelin Marisé",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2019"
}
The main objective of this thesis is to evaluate the application of the Last Planner S ystem method in the construction of multifamily buildings to determine if it is possibl e to obtain favorable results in production, in the city of Trujillo. Liberty Department. This study starts from the production data obtained by the balance sheet and gener al method in the construction of Park II California, where it reflects the productive w ork, contributory work and non-contributory work performed by the crews within the work; with which later we will use to make the weekly report of production, which fo cuses its control on the consumption of Hours Man measuring indices of Productivit y, The productivity curves have been obtained from weekly reports of production of a certain group, in these the budgeted yields are plotted, the daily and accumulated returns. According to the programming of the Lookahead and the daily schedule a comparat ive analysis of both is made, respectively, which will be dated 05/09/2018, in order t o verify with the compliance or not of the programmed at the beginning. After obtaining the results of the evaluation of the application of Last Planner Syste m, we have made proposals that we have applied to improve in some point where it is due to deficiencies Having made the proposals we have noticed an improvement with the productivity i n the construction of the building multifamily Park II.