Bibliographic citations
Napa, G., (2019). Optimización de procesos constructivos de cimentación aplicando metodología top down en edificaciones de oficinas en la ciudad de Lima [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/628204
Napa, G., Optimización de procesos constructivos de cimentación aplicando metodología top down en edificaciones de oficinas en la ciudad de Lima [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2019. http://hdl.handle.net/10757/628204
@misc{renati/369688,
title = "Optimización de procesos constructivos de cimentación aplicando metodología top down en edificaciones de oficinas en la ciudad de Lima",
author = "Napa Ercilla, Gumer Mayco",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2019"
}
In the present work a construction an office building in Lima has been evaluated through two construction processes, starting with the traditional one that consist of the stabilization of anchored walls versus the Top Down constructive process with foundation piles, the same that will determine which system provides better results, as well as the evaluation of the incidences related to cost and time. For this evaluation six chapters have been developed. In the first chapter, we describe the work plan to follow in order to reach the objectives proposed. The second chapter covers the theoretical framework which consist of describing main concepts, advantages, procedures and applications of each process under evaluation. In the third chapter, a descriptive analysis of the technical and economic variables is developed according to the building process with traditional foundation and anchored walls versus the top-down. In the fourth chapter, the project under evaluation is presented based on the top-down methodology, taking into account the selection criteria, methodology, the time limit and the cost associated. In addition, the office renting cost is analyzed according the square meter of the project for a later consideration of the investment return. On the other hand, in the fifth chapter, a descriptive analysis of the results of each process is carried out and comparative result tables of the principal technical and economic variables, thereby determining the best construction alternative. Finally, in chapter six, conclusions and recommendations are presented according to the objectives set.
This item is licensed under a Creative Commons License