Chávez, M., Javier, M. (2019). Propuesta de mejora para la reducción del sobredesperdicio del cemento y cerámico, basado en el análisis de los principales desperdicios generados en la construcción de edificaciones de gran altura en Lima Metropolitana [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/626416
Chávez, M., Javier, M. Propuesta de mejora para la reducción del sobredesperdicio del cemento y cerámico, basado en el análisis de los principales desperdicios generados en la construcción de edificaciones de gran altura en Lima Metropolitana [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2019. http://hdl.handle.net/10757/626416
@misc{renati/369019,
title = "Propuesta de mejora para la reducción del sobredesperdicio del cemento y cerámico, basado en el análisis de los principales desperdicios generados en la construcción de edificaciones de gran altura en Lima Metropolitana",
author = "Javier Flores, Melissa Angélica",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2019"
}
A construction project has as its main objectives the profitability and the obtaining of utility. Currently, in high-rise buildings these are being affected by excess consumption of unplanned, over-wasted material. The purpose of this thesis is to analyze and monitor the internal flow of two of the most incidental materials in the construction of a building, cement and ceramic, in order to propose as a proposal for improvement a work procedure that benefits the reduction of the over-waste. The methodology that was used to obtain the data of the analysis consisted of the field research method, given that the data collection was carried out directly from three building projects greater than fifteen floors high located in the city of Metropolitan Lima An analysis and monitoring of the distribution flow of the material was made and, in this way, results are obtained that allow the root problem to be determined in order to analyze it and implement the best alternative to reduce or eliminate these factors that lead to an increase in waste. It is concluded that the critical or main causes of these over-waste are the lack of monitoring, planning, management and communication that occurs in most construction companies, thereby establishing a work procedure for the development of an activity with the main objective to reduce the over-waste of the materials identified in its distribution flow.