Look-up in Google Scholar
Title: Desarrollo de un método para reducir el desperdicio de concreto en cimentaciones profundas contra terreno con el método constructivo Top To
Other Titles: Development of a method to reduce the waste of concrete in deep foundations against land with the Top To Down construction method
Advisor(s): Rodríguez Dionisio, Sandra
Issue Date: 17-Jan-2019
Institution: Universidad Peruana de Ciencias Aplicadas (UPC)
Abstract: Se pretende desarrollar un método para reducir el desperdicio de concreto en cimentaciones profundas contra terreno ejecutadas mediante el método constructivo “top to down”. Estas cimentaciones, específicamente pilotes y muros pantalla, se caracterizan por no contar con encofrado o una sección regular; por lo que, el volumen de concreto a emplear es muy variable; y por ende el desperdicio de concreto será variable entre un elemento y otro. Esta variabilidad se debe a factores como: exactitud de la excavadora o maquina a emplear, tipo de terreno, experiencia del personal, margen de desperdicio histórico de la organización. A lo largo de un proyecto se prevé un porcentaje de desperdicio de sus recursos, para así poder tener el costo estimado en la ejecución de partidas. Sin embargo, el estimado puede ser un valor muy lejano al real; ya que, no se cuenta con factores que se darán in situ, como pueden ser, exactitud de la maquinaria a emplear, tipo de terreno, experiencia del personal, entre otros; siendo así, de gran importancia sincerar el desperdicio considerado al inicio de un proyecto. En la presente tesina, se pretende sincerar el valor del factor inicial de desperdicio de concreto; es decir, aplicar una mejora continua al proceso, esto se logra mediante recopilación de datos vinculados al proceso, identificación del problema y de la causa raíz.

This thesis aims to develop a method to reduce the waste of concrete in deep foundations against land with the top down constructive method. These foundations, specifically piles and screen walls, do not have formwork or a regular section; so they are very variable in their excavation and therefore in the wasted concrete. Throughout a project, an estimate of the waste of its resources is calculated in order to have the estimated cost in the execution of its items. However, the estimate can be a value very far from the real one; since, it does not count on factors that will be given in situ, such as, accuracy of the machinery to be used, type of terrain, experience of the personnel, among others; being thus of great importance to make the waste considered at the beginning of a project. In the present thesis, it is tried to sincere the value of the initial factor, that guarantees to cover the waste that can be given during the constructive process for different reasons; that is, applying continuous improvement to the process, this is achieved by collecting data linked to the process, identifying the problem and the root cause.
Discipline: Ingeniería Civil
Grade or title grantor: Universidad Peruana de Ciencias Aplicadas (UPC). Facultad de ingeniería
Grade or title: Ingeniero Civil
Register date: 20-May-2019



This item is licensed under a Creative Commons License Creative Commons