Look-up in Google Scholar
Full metadata record
Uehara Yagi, José Daniel
Asto Fuentes, David Antonio (*)
Ccolcca Choquehuamani, Jessica (*)
Durand Baldeon, Martín Iván (*)
Ochoa Carrión, Juan Miguel (*)
Quitoran Godoy, Juan Manuel (*)
2018-04-10T01:09:05Z
2018-04-10T01:09:05Z
2017-12-22
Asto Fuentes, David Antonio ; Ccolcca Choquehuamani, Jessica ; Durand Baldeon, Martín Iván ; Ochoa Carrión, Juan Miguel ; Quitoran Godoy, J. M. (2017). Análisis de procesos que impactan en la productividad de una obra aplicando Lean Construction. Caso de estudio: Proyecto Multifamiliar Buganvillas Tercera Etapa – Comas para la etapa de estructuras y arquitectura. Universidad Peruana de Ciencias Aplicadas (UPC), Lima, Perú. Retrieved from http://hdl.handle.net/10757/623126 (es_PE)
http://hdl.handle.net/10757/623126
Objetivo: Analizar que los métodos de una gestión de producción basados en Lean Construction utilizados en la etapa de estructuras y arquitectura en la Construcción del edificio multifamiliar Buganvillas Etapa III producen un impacto en la productividad de la obra. Métodos: Se utilizarán los métodos del Lean Construcción, uso de cartas balance para la medición de productividad y análisis comparativo de ratios en las etapas anteriores del proyecto para la etapa de estructuras y arquitectura. Resultados: Se logra analizar la productividad de la mano de obra de los trabajadores obreros en la etapa de estructuras y se mide la productividad en etapa de arquitectura en el proyecto Edificio Multifamiliar Buganvilias –Tercera Etapa. Conclusiones: La aplicación de una mejora continua en metodologías del Lean Construcción indica que para mejorar las ratios históricas es necesario introducir nuevas tecnologías constructivas para optimizar ratios de mano de obra y de productividad en las obras.
Objective: Analyze that the methods of a production management is in Lean Construction used in the stage of structures and architecture in the Construction of the Multifamily Building Buganvillas Stage III produces an impact on the productivity of the work. Methods: Lean Construction methods will be used, use of balance sheets for the measurement of productivity and comparative analysis of the previous proportions of the project for the structure and architecture stage. Results: It was possible to analyze the productivity of the workforce at the stage of the architecture in the project Multifamily Building Buganvilias-Third Stage. Conclusions: The application of a continuous improvement in Lean Construction methodologies indicates that in order to improve historical proportions it is necessary to introduce new construction technologies to optimize proportions of labor and productivity in the works.
Trabajo de investigación (es_PE)
application/pdf (es)
application/epub (es)
application/msword (es)
spa (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
http://creativecommons.org/licenses/by-nc-sa/4.0/ (*)
Universidad Peruana de Ciencias Aplicadas (UPC) (es_PE)
Repositorio Académico - UPC (es_PE)
Gestión de la construcción (es)
Mejora continua (es)
Conjuntos residenciales (es)
Proyectos arquitectónicos (es)
Dirección de la construcción (es)
Análisis de procesos que impactan en la productividad de una obra aplicando Lean Construction. Caso de estudio: Proyecto Multifamiliar Buganvillas Tercera Etapa – Comas para la etapa de estructuras y arquitectura (es)
info:eu-repo/semantics/masterThesis (es_PE)
Universidad Peruana de Ciencias Aplicadas (UPC). Escuela de Postgrado (es_PE)
Escuela de Postgrado (es_PE)
Maestría (es_PE)
Magíster en Dirección de la Construcción (es_PE)
PE (es_PE)
https://purl.org/pe-repo/renati/level#maestro (es_PE)
https://purl.org/pe-repo/renati/type#trabajoDeInvestigacion (es_PE)
Privada societaria



This item is licensed under a Creative Commons License Creative Commons