Bibliographic citations
Gonzalez, A., Vasquez, A. (2021). Estudio de prefactibilidad para la instalación de una planta de producción de bebidas energéticas a partir de la utilización de cacao (Theobroma cacao l.), avena (Avena sativa) y endulzadas con stevia (Stevia rebaudiana) [Universidad de Lima]. https://hdl.handle.net/20.500.12724/15045
Gonzalez, A., Vasquez, A. Estudio de prefactibilidad para la instalación de una planta de producción de bebidas energéticas a partir de la utilización de cacao (Theobroma cacao l.), avena (Avena sativa) y endulzadas con stevia (Stevia rebaudiana) []. PE: Universidad de Lima; 2021. https://hdl.handle.net/20.500.12724/15045
@misc{renati/235883,
title = "Estudio de prefactibilidad para la instalación de una planta de producción de bebidas energéticas a partir de la utilización de cacao (Theobroma cacao l.), avena (Avena sativa) y endulzadas con stevia (Stevia rebaudiana)",
author = "Vasquez Neciosup, Alessandra Desiree",
publisher = "Universidad de Lima",
year = "2021"
}
This study will analyze the technical, commercial and economic-financial viability of the implementation of a plant that produces an energy drink made from oats and cocoa and sweetened with Stevia in Peru. First, Chapter I mentions the objectives, technical, economic and social justifications, as well as the hypothesis of the research. Regarding chapter II, a market study is carried out, calculating a total of 515 480 bottles for the first year and 1 233 234 bottles are projected for the tenth year. Later, in chapter III, the location alternatives are determined. It is concluded that the optimal place to locate it will be Lurín, in the department of Lima, Then, in Chapter IV, the size of the plant is calculated. In this case, the project will be delimited by market size. Later, in chapter V, the equipment and machinery that will be used in the plant are established, in turn, safety and environmental impact studies are carried out; as well as the final disposition of the plant is defined. Later, in chapter VI, the type of company, organization chart and functions of the personnel to be hired are mentioned. It was established that there will be 11 workers who will carry out their work in the productive area and 16 workers in the administrative area Then, in Chapter VII, the economic and financial analysis is carried out for the 10-year life horizon of the project, calculating an economic NPV of S/ 300 482,36 and an economic IRR of 24%, a financial NPV of S/ 437 192,26 and a financial IRR of 26%. Finally, in chapter VIII, the indicators that determine the social viability of the study are explained. An added value for the last year of S/ 8 091 206,7 was obtained.
This item is licensed under a Creative Commons License