Bibliographic citations
This is an automatically generated citacion. Modify it if you see fit
Bazan, G., Seas, M. (2021). Estudio de prefactibilidad para la instalación de una planta productora de carteras de cuero a base de piel de paiche [Universidad de Lima]. https://hdl.handle.net/20.500.12724/14331
Bazan, G., Seas, M. Estudio de prefactibilidad para la instalación de una planta productora de carteras de cuero a base de piel de paiche []. PE: Universidad de Lima; 2021. https://hdl.handle.net/20.500.12724/14331
@misc{renati/235841,
title = "Estudio de prefactibilidad para la instalación de una planta productora de carteras de cuero a base de piel de paiche",
author = "Seas Valdivia, Melanie Jazmin",
publisher = "Universidad de Lima",
year = "2021"
}
Title: Estudio de prefactibilidad para la instalación de una planta productora de carteras de cuero a base de piel de paiche
Authors(s): Bazan Jaramillo, Guillermo; Seas Valdivia, Melanie Jazmin
Advisor(s): Collao Díaz, Martín Fidel
Keywords: Bolsos de mano; Cuero; Paiche; Proyectos industriales; Estudios de factibilidad; Handbags; Leather; Industrial projects; Feasibility studies
OCDE field: https://purl.org/pe-repo/ocde/ford#2.11.04
Issue Date: 2021
Institution: Universidad de Lima
Abstract: El presente proyecto de prefactibilidad tiene como finalidad determinar la viabilidad
técnica, económica, financiera, social y de mercado para la instalación de una planta
productora de carteras de cuero de piel de paiche en Pucallpa.
La materia prima se obtendrá de los desechos generados para la industria
alimenticia. Cada pieza terminada de cuero de paiche pesa aproximadamente 1.4 kg y
tiene un área aproximada de 2 pies2
. Terminada la producción, se distribuirá el cuero en
rollos de 10 pieles a la ciudad de Lima para tercerizar la producción de carteras, que será
nuestro producto final.
Las carteras se venderán en tiendas por departamento Saga Falabella y Ripley y
los consumidores finales serán las mujeres de Lima Metropolitana de los niveles
socioeconómicos A y B, mayores a 35 años.
Después de realizar una encuesta, se obtuvo la demanda proyectada de los 5 años
del proyecto: 1866 carteras para el primer año. El precio por cartera es S/ 1 090.
La provincia más conveniente para la instalación de la planta de producción de
carteras de cuero de piel de pescado es Coronel Portillo, en el departamento de Ucayali
y el área total de la planta será de 759.95 m2
.
Por otro lado, se cuenta con la tecnología y la instrucción técnica necesaria para
instalar una planta en el mercado peruano. El proyecto será sostenido por un capital
humano liderado por dos socios y 14 colaboradores, entre labores administrativas y
trabajos en planta.
La inversion total será S/. 876 424, 70% financiado por una entidad bancaria y
30% corresponderá al aporte de accionistas. El proyecto presenta un VAN financiero de
S/ 1 402 819; una TIR financiera de 101.84%; una relación beneficio/costo de 6.38 y un
periodo de recupero de 1.58 años. Se concluye que el proyecto es económica y
financieramente viable.
The purpose of this pre-feasibility project is to determine the technical, economic, financial, social and market viability for the installation of paiche leather handbags production plant in Pucallpa. The raw material will be obtained from the waste generated in the food industry. Each finished piece of paiche leather weights approximately 1.4 kg and has an area of approximately 2 ft2. After producing the leather plates, they will be distributed in rolls of 10 plates to Lima to outsource the production of handbags, which will be the final product. The handbags will be sold at Saga Falabella and Ripley department stores and the final consumers will be women living in Metropolitan Lima of the socioeconomic levels A and B, over 35 years old. After conducting a survey of potential end consumers, the projected demand of the 5 years of the project was found, being 1 866 handbags for the first year. The price per handbag is S/ 1 090. The most convenient province for the installation of the fish skin leather production plant is Coronel Portillo, in the department of Ucayali, and the total area will be 759.95 m2. It has the technology and technical instruction necessary to install a plant in the Peruvian market. In addition, the project will be supported by a human capital led by two partners, with 14 collaborators, between administrative tasks and plant work. The total investment will be S/ 876 424, 70% financed by a bank and 30% will correspond to the contribution of shareholders. The project generates positive results, presenting a financial NPV of S/ 1 402 819, a financial IRR of 101.84%, a benefit / cost ratio of 6.38 and a payback period of 1.58 years. Therefore, it is concluded that the project is economically and financially viable.
The purpose of this pre-feasibility project is to determine the technical, economic, financial, social and market viability for the installation of paiche leather handbags production plant in Pucallpa. The raw material will be obtained from the waste generated in the food industry. Each finished piece of paiche leather weights approximately 1.4 kg and has an area of approximately 2 ft2. After producing the leather plates, they will be distributed in rolls of 10 plates to Lima to outsource the production of handbags, which will be the final product. The handbags will be sold at Saga Falabella and Ripley department stores and the final consumers will be women living in Metropolitan Lima of the socioeconomic levels A and B, over 35 years old. After conducting a survey of potential end consumers, the projected demand of the 5 years of the project was found, being 1 866 handbags for the first year. The price per handbag is S/ 1 090. The most convenient province for the installation of the fish skin leather production plant is Coronel Portillo, in the department of Ucayali, and the total area will be 759.95 m2. It has the technology and technical instruction necessary to install a plant in the Peruvian market. In addition, the project will be supported by a human capital led by two partners, with 14 collaborators, between administrative tasks and plant work. The total investment will be S/ 876 424, 70% financed by a bank and 30% will correspond to the contribution of shareholders. The project generates positive results, presenting a financial NPV of S/ 1 402 819, a financial IRR of 101.84%, a benefit / cost ratio of 6.38 and a payback period of 1.58 years. Therefore, it is concluded that the project is economically and financially viable.
Link to repository: https://hdl.handle.net/20.500.12724/14331
Discipline: Ingeniería Industrial
Grade or title grantor: Universidad de Lima. Facultad de Ingeniería y Arquitectura
Grade or title: Ingeniero Industrial
Juror: Molina Quenaya, Shaminy; Corzo Chávez, Jorge; Tejeda Prada, Gino
Register date: 21-Oct-2021
This item is licensed under a Creative Commons License