Hidalgo, H., (2023). Estudio de prefactibilidad para la instalación de una planta para la producción de snacks de sacha inchi cubiertos con miel de abeja [Universidad de Lima]. https://hdl.handle.net/20.500.12724/18460
Hidalgo, H., Estudio de prefactibilidad para la instalación de una planta para la producción de snacks de sacha inchi cubiertos con miel de abeja []. PE: Universidad de Lima; 2023. https://hdl.handle.net/20.500.12724/18460
@misc{renati/235771,
title = "Estudio de prefactibilidad para la instalación de una planta para la producción de snacks de sacha inchi cubiertos con miel de abeja",
author = "Hidalgo Barreto, Huberth",
publisher = "Universidad de Lima",
year = "2023"
}
The study presented evaluates market, technology, economic, financial and social feasibility for the installation of a sacha inchi seed processing plant covered with bee honey for the Lima Metropolitana market. The product will be named “Sacha Honey“ and will be sold at the recommended price of 3,50 soles in a premium presentation of 30 grams. The product is rich in Omega 3 and Omega 6, topped with honey bee that will give it a sweet and more attractive taste. It is distributed in specialized stores, supermarkets and through e-commerce. The target market of the project will be the inhabitants of Lima Moderna, specifically the ones who belong to socioeconomic levels A and B. In the first year the demand for the project will be 25 760 boxes containing 48 bags of the finished product. In addition, through location analysis, it was determined that the optimal location for the plant is in the department of Lima, in the province of Huarochirí, in the district of San Antonio with an estimated land of 1 200 m2. The size of the plant is determined by the last year of the market with 30 736 boxes of the finished product. The total investment required for the project is S/ 824 489, of which 60% will be of own contributions and 40% financed with a 5-year loan with an effective annual rate of 6%. The economic assessment showed that the project is viable as the economic NPV of S/ 394 053 was obtained, an IRR of 20,60% in a recovery period in 3,6 years. Similarly, the financial assessment also showed that it is profitable with a financial NPV S/ 377 868, a financial IRR of 29,19% and a recovery period in 3,1 years.