Title: Estudio de prefactibilidad para la instalación de una planta productora de chorizo precocido a base de carne de cuy (Cavia porcellus) enriquecido con quinua (Chenopodium quinoa willd)
Advisor(s): Corzo Chávez, Jorge Antonio
OCDE field: https://purl.org/pe-repo/ocde/ford#2.11.04
Issue Date: 2021
Institution: Universidad de Lima
Abstract: Se realizó un estudio de prefactibilidad para la instalación de una planta productora de chorizo precocido a base de carne de cuy enriquecido con quinua, por el que se determinó la viabilidad de mercado, técnica, económica, financiera, medioambiental y social del proyecto. El desarrollo del presente trabajo, surgió a partir de la problemática identificada en el Perú, en la que, según la Organización Panamericana de la Salud y cifras obtenidas por el Instituto Nacional de Estadística e Informática, existe un gran porcentaje de enfermedades relacionadas al cáncer, diabetes, enfermedades respiratorias crónicas y cardiovasculares y desnutrición crónica en niños. Por ello, se buscó desarrollar un producto saludable, dado los grandes beneficios para la salud de la carne de cuy y la quinua, como fuente de proteínas y de ácidos grasos y aminoácidos esenciales, entre otros aportes. Se realizó un estudio de mercado, en el que se definió como mercado objetivo a Lima Metropolitana, específicamente las zonas 6 (Jesús María, Lince, Pueblo Libre, Magdalena y San Miguel) y 7 (Miraflores, San Isidro, San Borja, Surco y La Molina), niveles socioeconómicos A, B y C, edades entre 20 y 64 años y estilos de vida sofisticados y modernas. Además, se determinó la demanda del proyecto, la cual resultó ser 36 675 cajas de producto terminado en el último año de vida útil, 2024. Por otra parte, se calculó una inversión total de S/4 692 945, donde el 68,49% es de capital propio y el 31,51% es de préstamo. Además, se determinó un COK de 19,56% y un CPPC de 17,27%. En la evaluación económica se obtuvo un VAN de S/5 521 679, una TIR de 54,55%, B/C de 2,18 y un periodo de recupero de 2,70 años. Mientras que en la evaluación financiera se obtuvo un VAN de S/5 797 205, una TIR de 68,26%, B/C de 2,80 y un periodo de recupero de 2,23 años. Por último, se realizó una evaluación social, en la que se obtuvo un valor agregado actual de S/27 782 706.

A prefeasibility study was carried out for the installation of a precooked chorizo producing plant based on guinea pig meat enriched with quinoa, which determined the market, technical, economic, financial, environmental and social viability of the project. The development of this work, arose from the problems identified in Peru, in which, according to the Pan American Health Organization and figures obtained by the National Institute of Statistics and Informatics, there is a large percentage of diseases related to cancer, diabetes, chronic and cardiovascular respiratory diseases and chronic malnutrition in children. Therefore, the aim was to develop a healthy product, given the great health benefits of guinea pig meat and quinoa, as a source of proteins and fatty acids and essential amino acids, among other contributions. A market study was carried out, in which Metropolitan Lima was defined as the target market, specifically zones 6 (Jesús María, Lince, Pueblo Libre, Magdalena and San Miguel) and 7 (Miraflores, San Isidro, San Borja, Surco and La Molina), socioeconomic levels A, B and C, ages between 20 and 64 years and sophisticated and modern lifestyles. In addition, demand for the project was determined, which turned out to be 36 675 boxes of finished product in the last year of service life, 2024. On the other hand, a total investment of S/4 692 945 was calculated, where 68,49% is equity capital and 31,51% is loan. In addition, a COK of 19,56% and a CPPC of 17,27%. The economic assessment obtained a NPV of S/5 521 679, an IRR of 54,55%, B/C of 2,18 and a recovery period of 2,70 years. While the financial assessment obtained a NPV of S/5 797 205, an IRR of 68,26%, B/C of 2,80 and a recovery period of 2,23 years. By achieving a positive NPV, an IRR greater than COK and a B/C greater than 1, it can be inferred that this project is feasible and viable. Finally, a social assessment was carried out, resulting in an actual value added of S/27 782 706.
Discipline: Ingeniería Industrial
Grade or title grantor: Universidad de Lima. Facultad de Ingeniería y Arquitectura
Grade or title: Ingeniero Industrial
Juror: Sotomayor Cabrera, Arístides; Collao Diaz, Martín Fidel; Montero Sarmiento, Edgardo Roberto
Register date: 14-Mar-2022



This item is licensed under a Creative Commons License Creative Commons