Lo, F., Vives, D. (2022). Estudio de prefactibilidad para la instalación de un hotel ecológico en el departamento de San Martín [Universidad de Lima]. https://hdl.handle.net/20.500.12724/17185
Lo, F., Vives, D. Estudio de prefactibilidad para la instalación de un hotel ecológico en el departamento de San Martín []. PE: Universidad de Lima; 2022. https://hdl.handle.net/20.500.12724/17185
@misc{renati/235025,
title = "Estudio de prefactibilidad para la instalación de un hotel ecológico en el departamento de San Martín",
author = "Vives Zamora, Danna",
publisher = "Universidad de Lima",
year = "2022"
}
Title: Estudio de prefactibilidad para la instalación de un hotel ecológico en el departamento de San Martín
Authors(s): Lo Aza, Francesca Paola; Vives Zamora, Danna
Advisor(s): Arroyo Gordillo, Pedro Antonio
Keywords: Alojamientos turísticos; Paneles solares; Tratamiento de aguas; Proyectos industriales; Estudios de prefactibilidad; San Martín (Perú : Departamento); Tourist camps, hostels, etc.; Solar panels; Water treatment; Industrial projects; Prefeasibility studies
OCDE field: https://purl.org/pe-repo/ocde/ford#2.11.04
Issue Date: 2022
Institution: Universidad de Lima
Abstract: El proyecto consiste en el estudio de prefactibilidad para la instalación de un hotel
ecológico de cuatro estrellas en San Martín que se caracteriza, por contar con una planta
de tratamiento de aguas residuales mediante la ozonización y paneles solares que
trabajarán con energía solar. El proyecto tendrá un periodo de análisis de 5 años.
El servicio está dirigido a turistas mayores de 18 años, que buscan una experiencia
conectada con la naturaleza y cuidar el medio ambiente.
A través del análisis de data histórica y mediante la realización de encuestas a
potenciales visitantes de San Martín se determinó la demanda del proyecto en 9,861
pernoctaciones (28 habitaciones) en el último año de proyección. Sin embargo, por ser
de categoría cuatro estrellas, se construirán 30 habitaciones.
Adicionalmente, se realizó un estudio de localización que permitió determinar la
ubicación idónea en Tarapoto.
Se determinó también que la planta de tratamiento de aguas residuales ahorrará el
consumo de agua potable en un 30% y el número de paneles solares a utilizar cubriría el
50% del consumo eléctrico.
La inversión total requerida entre activos y capital de trabajo asciende a
S/1,299,466.61, de lo cual el 30% será financiado y la diferencia será aportada por los
accionistas. Con la evaluación económica-financiera, se determinó el VAN y TIR
económicos en S/ 47,059.27 y 16.67%; el VAN y TIR financieros se calcularon en S/
136,633.35 y 19.42%; ambos TIR mayor al COK de 15.68%. La inversión se recuperaría
en 4 años y 9 meses.
Por último, según la evaluación social, se determinó la densidad de capital en
S/61,044.8 y la intensidad de capital en 0.26 soles.
The project deals with the pre-feasibility study for the installation of an ecological hotel in San Martín, which mainly concerns an account of a water treatment plant that works with the generation of wastewater and solar panels that will work with solar energy. The project will have a period of analysis of 5 years. The service is directed towards tourists over 18 years old that seek an experience related to nature and taking care of the environment at the same time. Through the analysis of historical data and through surveys of potential visitors to the San Martin region, the demand for the project was determined in 9,861 overnight stays in the last year. Additionally, a location study was carried out that allowed determining the ideal location in Tarapoto. It was also determined that the wastewater treatment plant would save 30% of the consumption and the number of solar panels to be used would cover 50% of the daily energy requirement. The total investment required between assets and working capital amounts to S/1,299,466.61, of which 30% will be financed and the difference will be contributed by the shareholders. With the economic-financial evaluation, the economic NPV and IRR were determined at S/ 47,059.27 and 16.67% higher than the COK of 15.68%; The financial NPV and IRR were calculated 136,633.35 and 19.42%also higher than the COK, the investment would be recovered in 4 years and 10 months. Finally, a social evaluation was carried out including capital density indicators resulting in S/61,044.8 and capital intensity of 0.26 soles.
The project deals with the pre-feasibility study for the installation of an ecological hotel in San Martín, which mainly concerns an account of a water treatment plant that works with the generation of wastewater and solar panels that will work with solar energy. The project will have a period of analysis of 5 years. The service is directed towards tourists over 18 years old that seek an experience related to nature and taking care of the environment at the same time. Through the analysis of historical data and through surveys of potential visitors to the San Martin region, the demand for the project was determined in 9,861 overnight stays in the last year. Additionally, a location study was carried out that allowed determining the ideal location in Tarapoto. It was also determined that the wastewater treatment plant would save 30% of the consumption and the number of solar panels to be used would cover 50% of the daily energy requirement. The total investment required between assets and working capital amounts to S/1,299,466.61, of which 30% will be financed and the difference will be contributed by the shareholders. With the economic-financial evaluation, the economic NPV and IRR were determined at S/ 47,059.27 and 16.67% higher than the COK of 15.68%; The financial NPV and IRR were calculated 136,633.35 and 19.42%also higher than the COK, the investment would be recovered in 4 years and 10 months. Finally, a social evaluation was carried out including capital density indicators resulting in S/61,044.8 and capital intensity of 0.26 soles.
Link to repository: https://hdl.handle.net/20.500.12724/17185
Discipline: Ingeniería Industrial
Grade or title grantor: Universidad de Lima. Facultad de Ingeniería y Arquitectura
Grade or title: Ingeniero Industrial
Juror: Salazar Medina, Nicolás Francisco; Arroyo Gordillo, Pedro Antonio; Avalos Ortecho, Edilberto Miguel; Malaga Ortiz, Maria Teresa
Register date: 7-Dec-2022
This item is licensed under a Creative Commons License