Bibliographic citations
Lazarte, C., (2021). Estudio de prefactibilidad para la instalación de una planta productora de pan pita con adición de harina de bagazo de uva [Universidad de Lima]. https://hdl.handle.net/20.500.12724/15607
Lazarte, C., Estudio de prefactibilidad para la instalación de una planta productora de pan pita con adición de harina de bagazo de uva []. PE: Universidad de Lima; 2021. https://hdl.handle.net/20.500.12724/15607
@misc{renati/234934,
title = "Estudio de prefactibilidad para la instalación de una planta productora de pan pita con adición de harina de bagazo de uva",
author = "Lazarte Rey, Christian Rodrigo",
publisher = "Universidad de Lima",
year = "2021"
}
During my college period and pre-professional practices, I have acquired different knowledge and skills for the appropriate profile of an industrial engineer. In this document, a correct development will be demostrated in the research and analysis for the pre-feasibility study for installation of a production plant of pita bread with addition of grape bagsue flour, product obtained from wine grinding. The present investigation shows us the problematic that increases more and more, which is partially, solved with this project, at the same time, this investigation details the scientific hypothesis, objective justification and the framework, which is shown in the first chapter. For chapter two, a market study was developed in which the accurate demand for the parameters within the Peruvian reality is established and through an estimate without historical data base and the results of surveys of intention, intensity and frequency of purchase. Regarding chapter three, we analyzed which city and province is more suitable to develop the project. These parameters were evaluated by a macro and micro location analysis through a confrontation matrix. The plant size, chapter four, was determined by the previously established market size. Because, it defines the production capacity with which it will work throughout the lifetime of the project. In chapter five, all the technical information of the project is presented from the production of the product to the layout of the final plant. It includes all the necessary tangible and intangible requirements and ends with an execution plan on an estimate schedule. For chapter six; a rigorous organizational, administrative and accounting structure of the project was studied in depth for subsequent analysis in Chapter 7. In relation to chapter 7, the feasibility (profitability) of the project was determined through the economic, financial and a sensitivity evaluation; in addition, a social analysis was developed to evaluate the positive impact on this aspect.
This item is licensed under a Creative Commons License