Citas bibligráficas
Gallardo, A., Pacheco, C. (2022). Estudio de prefactibilidad para la instalación de una planta productora de stevia rebaudiana (Stevia rebaudiana) [Universidad de Lima]. https://hdl.handle.net/20.500.12724/16033
Gallardo, A., Pacheco, C. Estudio de prefactibilidad para la instalación de una planta productora de stevia rebaudiana (Stevia rebaudiana) []. PE: Universidad de Lima; 2022. https://hdl.handle.net/20.500.12724/16033
@misc{renati/234911,
title = "Estudio de prefactibilidad para la instalación de una planta productora de stevia rebaudiana (Stevia rebaudiana)",
author = "Pacheco Oviedo, Cesar Andre",
publisher = "Universidad de Lima",
year = "2022"
}
Nowadays Peruvian population has been variating their consumption habits, frequently choosing those options with lower caloric values, or opting for more naturally produced food. That trend is expected to be satisfied by the launch of new products and the increased market share of others. The first chapter of this investigation will cover the objectives and problematics, the hypothesis will be justified based on a referential and conceptual framework. Nowadays the most consumed sweetener is sugar, a fact which was confirmed by the pool, although the trend of replacing sugar with other healthier sweeteners will continue raising as the new law of “Healthy Nutrition” was issued in 2019. The factor ranking was used to determine the location of the micro location and macro location. The result of these evaluations was that the production plant would be in the city of Lima, in the Lurigancho district. The type of technology selected was the membrane filtration method, patented by Kuttowy in 1999, since it had greater advantages for the project. The plant's production capacity is 5,19 tons per year of finished product, approximately 297 thousand dispensers. On the other hand, the layout of the plant was elaborated based on the Guerchet method and the relational analysis of the areas. Chapter VI determines the organizational structure of the company, as well as the salary of the employees. Chapter VII and VIII perform the financial structure of the company, as well as analysis of its main indicators. The results of these analyzes indicate that it takes 4 years and a month to recover the investment placed on the company, obtaining a financial NPV of 1,3 million soles, as well as an IRR of 48,05%. From these indicators it can be concluded that the project is viable.