Look-up in Google Scholar
Title: Diseño de un plan de mantenimiento preventivo para la flota de volquetes de 30 toneladas de una empresa de transporte de cargas de desmonte y mineral
Other Titles: Design of a preventive maintenance plan for the 30-ton dump truck fleet of a transportation company of loads of waste and mineral
Advisor(s): Hurtado Campos, Luis
OCDE field: https://purl.org/pe-repo/ocde/ford#2.03.01
Issue Date: 2022
Institution: Universidad de Ingeniería y Tecnología
Abstract: El presente trabajo de tesis consiste en la elaboración de un plan de mantenimiento preventivo para la flota de once volquetes Volvo FMX de la empresa Transportes Dueñas. Actualmente, esta empresa presta sus servicios de transporte de mineral y desmonte a la Compañía Minera Corona en su unidad de producción Yauricocha (Yauyos, Lima). Es por eso que la empresa de transportes tiene que garantizar que sus volquetes se encuentren en condiciones óptimas para la realización del trabajo; sin embargo, el mantenimiento que la empresa aplica a sus unidades es 70% mantenimiento correctivo. Ante la problemática descrita, surge el diseño del plan de mantenimiento preventivo como primera y urgente solución. Para la realización de este trabajo, en primer lugar, se analizará la situación actual de la empresa. Utilizando el historial de data de reparaciones y cambios de repuestos, entrevistas y visitas al taller, se podrá realizar el análisis FODA. En segundo lugar, se diseñará el plan de mantenimiento preventivo en base al análisis previo. En tercer lugar, se calculará los costos e indicadores (disponibilidad, MTBF y MTTR) asociados al plan propuesto. Para ello, se utilizará costos y tiempos reales. Finalmente, los resultados de este proyecto fueron evaluados económicamente, dando como resultado un plan viable económicamente (ROI = 119%).

The present thesis work consists of the elaboration of a preventive maintenance plan for the fleet of eleven Volvo FMX dump trucks of the company Transportes Dueñas. Currently, this company provides its ore and waste mining transportation services to the Compañía Minera Corona at its Yauricocha production unit (Yauyos, Lima). That is why the transport company has to guarantee that its dump trucks are in optimal conditions for the performance of the work; however, the maintenance that the company applies to its units is 70% corrective maintenance. Given the problem described, the design of the preventive maintenance plan arises as the first and urgent solution. To carry out this work, in the first place, the current situation of the company will be analyzed. Using the history of data of repairs and replacement of spare parts, interviews and visits to the workshop, the SWOT analysis can be carried out. Second, the preventive maintenance plan will be designed based on the previous analysis. Third, the costs and indicators (availability, MTBF and MTTR) associated with the proposed plan will be calculated. For this, real costs and times will be used. Finally, the results of this project were economically evaluated, and the result is that this maintenance plan is viable (ROI = 119%).
Discipline: Ingeniería Mecánica
Grade or title grantor: Universidad de Ingeniería y Tecnología. Ingeniería Mecánica
Grade or title: Ingeniero Mecánico
Juror: Noel, Julien Georges Andre; Álvarez Sánchez, Helard Henry; Ramos Saravia, José César
Register date: 18-Apr-2022



This item is licensed under a Creative Commons License Creative Commons