Bibliographic citations
Mariñas, D., Harodl, D. (2023). Estudio comparativo entre costo y tiempo de ejecución entre los pavimentos: rígidos, flexibles y semirrígidos en el barrio la unión, distrito de Shamboyacu, provincia de Picota, departamento de San Martín [Tesis, Universidad Científica del Perú]. http://hdl.handle.net/20.500.14503/2592
Mariñas, D., Harodl, D. Estudio comparativo entre costo y tiempo de ejecución entre los pavimentos: rígidos, flexibles y semirrígidos en el barrio la unión, distrito de Shamboyacu, provincia de Picota, departamento de San Martín [Tesis]. PE: Universidad Científica del Perú; 2023. http://hdl.handle.net/20.500.14503/2592
@misc{renati/197142,
title = "Estudio comparativo entre costo y tiempo de ejecución entre los pavimentos: rígidos, flexibles y semirrígidos en el barrio la unión, distrito de Shamboyacu, provincia de Picota, departamento de San Martín",
author = "Harodl Víctor, Del Aguila Rojas",
publisher = "Universidad Científica del Perú",
year = "2023"
}
The purpose of this study is to make a comparison between the cost and execution time of a rigid, flexible and semi-rigid paving project, in order to achieve an optimal design in the paving of Barrio la Unión, district of Shamboyacu, province of Picota, Department of San Martin. Based on the behavior of each of these, based on the fact that the three alternatives are satisfactory solutions for the paving project, and focusing the analysis on two prevailing factors; On the one hand, the economic factor, in which the cost of each alternative and the useful life are involved. On the other hand, the functional factor is exposed, through which the execution time of the three pavements will be verified and therefore which is the most appropriate. The project is based on a descriptive investigation, presenting the characteristics of rigid, flexible and semi-rigid pavements, as well as their cost analysis, their advantages and disadvantages, execution time, as a case of application, the Barrio la Unión will be taken, in the Shamboyacu district, Picota province, San Martin department, these will allow us to identify the best alternative based on cost and execution time, concluding which is the best option to carry out each of the three projects. In conclusion, rigid pavement would be the best option to use technically, although initially it is more expensive in the long term, the maintenance cost is lower.
This item is licensed under a Creative Commons License