Bibliographic citations
Valencia, C., Villagra, L. (2018). Estudio de factibilidad técnico y económico de la industrialización de la leche de quinua en la región de Cusco, 2018. [Tesis, Universidad Andina del Cusco]. https://hdl.handle.net/20.500.12557/2045
Valencia, C., Villagra, L. Estudio de factibilidad técnico y económico de la industrialización de la leche de quinua en la región de Cusco, 2018. [Tesis]. : Universidad Andina del Cusco; 2018. https://hdl.handle.net/20.500.12557/2045
@misc{renati/18216,
title = "Estudio de factibilidad técnico y económico de la industrialización de la leche de quinua en la región de Cusco, 2018.",
author = "Villagra Butista, Lucero",
publisher = "Universidad Andina del Cusco",
year = "2018"
}
In the Peruvian market, there are no products of great positioning that take advantage of the nutritional advantages of the original inputs to satisfy these nutritional needs. This thesis work aims to present a descriptive development of the technical and economic feasibility of the industrialization of quinoa milk. This thesis work includes methodologies to be used in the process, which will be applied correctly for development and meet the objectives. This project seeks to take advantage of this trend of consumption of healthy products as well as the properties and availability of quinoa by developing a drink made from this cereal aimed at people aged 13 to 60 years of socioeconomic levels A and B of the district of Cusco, using the Buyer Persona methodology, the inbound marketing will be carried out for the product. Through a market study with population: the Cusco region, Cusco district, the demand and supply of the project was quantified. Then, a technical study was carried out to design the production process focused on the production of quinoa milk in the Cusco Region, where different procedures were carried out, such as calculations in relation to Size-Product, Size-Technology and Capacity chosen for the subsequent design and calculation of the distribution of the plant, the processes with the DOP and DAP diagrams were also systematized. Finally, the feasibility of the project was analyzed through economic and financial study. As a result, it was obtained that the project is economically and financially feasible because a TIRE of 67.58% and an ITRF of 148.17% were determined, both higher than the COK, the B / C (1.52) and the recovery period (in 7 months approx.)
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.