Bibliographic citations
Nuñez, D., (2024). Implementación del plan de continuidad de negocios para mejora de los procesos críticos del cultivo de arándano en una empresa agroindustrial de la ciudad de Motupe, al 2023 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/39739
Nuñez, D., Implementación del plan de continuidad de negocios para mejora de los procesos críticos del cultivo de arándano en una empresa agroindustrial de la ciudad de Motupe, al 2023 [Tesis]. PE: Universidad Privada del Norte; 2024. https://hdl.handle.net/11537/39739
@misc{renati/1675310,
title = "Implementación del plan de continuidad de negocios para mejora de los procesos críticos del cultivo de arándano en una empresa agroindustrial de la ciudad de Motupe, al 2023",
author = "Nuñez Jimenez, Dennis Antonio",
publisher = "Universidad Privada del Norte",
year = "2024"
}
The present research sought to determine the influence of the implementation of a Business Continuity Plan to improve the critical processes of blueberry cultivation in the agroindustrial company Plantaciones del Sol S.A.C., for this purpose a quantitative approach was considered, applied, with a non-experimental design, correlational scope with longitudinal cut. The sample consisted of the 6 critical processes of the blueberry crop. The results showed that the critical processes variable presented a high level with 27.5% and a medium level with 72.5%, the latter is due to the fact that sometimes technological tools are used for irrigation of the blueberry crop hectares, almost never technological tools are used for the transfer of raw material, almost never technological tools are used for the entry of raw material and almost never technological tools are used for the weighing and selection of blueberry raw material. In addition, the data collection form was implemented with respect to the maximum allowable interruption time and target recovery time, and as a criterion it was concluded that it is important. In addition, an application was implemented to improve the harvesting process. Finally, it was determined that the implementation of a Business Continuity Plan does improve the critical processes of the blueberry crop in the agroindustrial company Plantaciones del Sol S.A., according to the result of the T studient test with a p-value = 0.000 lower than 0. 05.
This item is licensed under a Creative Commons License