Bibliographic citations
Herrera, C., Pullo, H. (2023). Estudio de prefactibilidad para la instalación de una planta de indumentaria deportiva con dispositivos GPS para la gestión del rendimiento deportivo [Universidad de Lima]. https://hdl.handle.net/20.500.12724/18230
Herrera, C., Pullo, H. Estudio de prefactibilidad para la instalación de una planta de indumentaria deportiva con dispositivos GPS para la gestión del rendimiento deportivo []. PE: Universidad de Lima; 2023. https://hdl.handle.net/20.500.12724/18230
@misc{renati/1442753,
title = "Estudio de prefactibilidad para la instalación de una planta de indumentaria deportiva con dispositivos GPS para la gestión del rendimiento deportivo",
author = "Pullo Salazar, Henry David",
publisher = "Universidad de Lima",
year = "2023"
}
The purpose of this research project is to evaluate the economic, technological, financial, and environmental feasibility of installing a plant for the production of sportswear with GPS devices for the management of sports performance. The useful life of the project will be 5 years The research is aimed at educational and sports institutions in Lima Metropolitana. There are four sports segments in which the project will carry out the research: Peruvian professional soccer, youth soccer training divisions, universities and schools. The product will be sold in sports kits directly to institutions, in which it will carry the vest and the GPS sensor. The production plant will be located in the department of Lima and in the district of Santa Anita. It was determined that the raw material can be obtained locally in the country, as well as the nylon fabric and electronic components. The machines and equipment to be used are manual and semi-automatic. Regarding company’s workforce, there will be 7 administrative collaborators, 1 indirect collaborator and 13 operators. Regarding the total investment of the project, it is estimated that it will be for 393 336 soles, in which 60% will be from the shareholders own capital and 40% will be financed by the bank, with an effective annual rate of 19.44 %. It should be noted that, for the debt service, a pre-operational year and a partial grace period with increasing installments were considered. Finally, it was determined that the project is economically and financially viable, with a net profit at the end of the useful life of the project of 204 761.18 soles. Both the economic and financial NPV are greater than zero, and the IIR is greater than the COK. Regarding the payback period, for the economic and financial sphere is approximately 4 years.
This item is licensed under a Creative Commons License