Bibliographic citations
This is an automatically generated citacion. Modify it if you see fit
Isa, L., Peña, C. (2022). Estudio de prefactibilidad para la instalación de una planta productora de arroz instantáneo [Universidad de Lima]. https://hdl.handle.net/20.500.12724/16674
Isa, L., Peña, C. Estudio de prefactibilidad para la instalación de una planta productora de arroz instantáneo []. PE: Universidad de Lima; 2022. https://hdl.handle.net/20.500.12724/16674
@misc{renati/1441743,
title = "Estudio de prefactibilidad para la instalación de una planta productora de arroz instantáneo",
author = "Peña Zavala, Carlos Alejandro",
publisher = "Universidad de Lima",
year = "2022"
}
Full metadata record
León Gambetta Martín Arranz, Álvaro
Isa Kohatsu, Leonardo Takeshi
Peña Zavala, Carlos Alejandro
2022-10-04T19:29:31Z
2022-10-04T19:29:31Z
2022
Isa Kohatsu, L. T. y Peña Zavala, C. A. (2022). Estudio de prefactibilidad para la instalación de una planta productora de arroz instantáneo [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/16674 (es_PE)
https://hdl.handle.net/20.500.12724/16674
En el presente proyecto se realizó un estudio de pre factibilidad para la instalación de una
planta productora de arroz instantáneo para microondas. El objetivo general es determinar
la viabilidad de mercado, técnica, social y económica del proyecto.
Este tema surge a partir de la creciente falta de tiempo que presentan las personas
en el día a día y la importancia de la alimentación saludable. Además, el arroz juega un
papel protagónico en la gastronomía peruana, presente en muchos platos típicos.
Este producto está dirigido a personas que vivan en Lima Metropolitana, que
consuman arroz de manera regular y que estén dispuestas a consumir comida instantánea.
Se trata de arroz precocido, el cual se introduce al microondas en un plato junto con agua
por 3 minutos y se obtiene la porción de arroz. El sabor elegido es arroz con choclo y la
presentación es individual (125 gramos).
La planta se localizará en el distrito de Puente Piedra, en el norte de Lima. Esta
contará con una capacidad de producción máxima anual de 509,27 toneladas y un área de
600 metros cuadrados.
El proceso de producción incluye actividades como el pesado, tamizado, lavado,
centrifugado, mezclado, precocido, deshidratado, enfriado, embolsado y encajado.
La inversión requerida es de S/2 611 529. La composición del financiamiento se
compone en un 60% de capital propio y 40% de financiamiento externo. Se obtiene un
finalmente un Valor Actual Neto Económico de S/700 030 y un Financiero de S/842 147.
Además, se espera una Tasa Interna de Retorno Económica y Financiera de 16% y 22%,
respectivamente.
El indicador social más importante del presente proyecto es el Producto – Capital,
el cual indica la rentabilidad del proyecto. Este indicador es de 3,10, es decir, por cada S/
1 invertido, se produce un valor agregado de S/ 3,10. (es_PE)
In this project, a pre feasibility study was carried out for the installation of an
instantaneous microwave rice production plant. The general objective is to verify the
market, technical, social and economic viability of the project.
This issue emerges due to the increasing lack of time that people have in the day
to day and the importance of healthy eating in daily life. In addition, rice plays a leading
role in Peruvian gastronomy and is present in many typical dishes.
This product focuses on people who live in Lima Metropolitana, consume rice
regularly and who are willing to consume instant food. The product is pre-cooked rice,
which is microwaved in a dish with water for 3 minutes.
The chosen flavor is rice with corn and the presentation is individual (125 grams)
The plant will be located in Puente Piedra, in the north of Lima. It has a maximum
anual production capacity of 509,27 tons and an area of 600 square meters.
The production process includes activities such as weighing, sieving, washing,
centrifuging, mixing, pre-cooked, dehydrated, cooled, bagged and embedded.
The required investment is S/2 611 529. The Financing is composed on 60% own
capital and 40% external financing. Finally, a Net Present Economic Value of S/700 030
and a financial of S/3 975 982. In addition, an Internal Economic and Financial Return
Rate of 16% and 22% respectively, is expected.
The most important social indicator is Product-Capital, which indicates the
profitability of the project. This indicator is 3,10, that means that for every S/1 invested,
there is S/3,10 of value added. (en_EN)
application/pdf
spa
Universidad de Lima
info:eu-repo/semantics/openAccess (*)
https://creativecommons.org/licenses/by-nc-sa/4.0/ (*)
Repositorio Institucional Ulima
Universidad de Lima
Rice (en_EN)
Fast foods (en_EN)
Feasibility studies (en_EN)
Arroz (es_PE)
Comidas rápidas (es_PE)
Estudios de factibilidad (es_PE)
Ingeniería industrial / Producción (es_PE)
Estudio de prefactibilidad para la instalación de una planta productora de arroz instantáneo (es_PE)
info:eu-repo/semantics/bachelorThesis
Universidad de Lima. Facultad de Ingeniería y Arquitectura
Ingeniería Industrial
Título Profesional
Ingeniero Industrial
PE
https://purl.org/pe-repo/ocde/ford#2.11.04
http://purl.org/pe-repo/renati/level#tituloProfesional (*)
44032329
https://orcid.org/0000-0002-8523-9701
75852800
70376707
722026
Cabrera Gil Grados, Ezilda Maria
León-Gambetta Martin-Arranz, Álvaro
Carreño Bardales, Pedro César
Montoya Ramírez, Manuel Fernando
https://purl.org/pe-repo/renati/type#tesis (*)
Privada asociativa
This item is licensed under a Creative Commons License