Bibliographic citations
Robles, F., (2022). Gestión de riesgos en la planificación de la ejecución de la obra de agua y alcantarillado sanitario en el Distrito de la Esperanza [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/9457
Robles, F., Gestión de riesgos en la planificación de la ejecución de la obra de agua y alcantarillado sanitario en el Distrito de la Esperanza [Tesis]. PE: Universidad Privada Antenor Orrego; 2022. https://hdl.handle.net/20.500.12759/9457
@misc{renati/1357951,
title = "Gestión de riesgos en la planificación de la ejecución de la obra de agua y alcantarillado sanitario en el Distrito de la Esperanza",
author = "Robles Bejarano, Francesco André",
publisher = "Universidad Privada Antenor Orrego",
year = "2022"
}
The construction projects promoted and financed by the Peruvian State are carried out under considerable uncertainty, since it is very difficult to control some internal and external variables that affect the performance of the projects in terms of time, cost, quality and efficiency. Currently many projects are not successfully carried out within the cost and contractual term. To maintain this situation, it is necessary to adopt a method that helps increase the possibility of making construction projects more successful. The objective of this research study is risk management in the planning of the execution of the water and sanitary sewer work in the district of La Esperanza, to determine why the use of techniques and tools, based on the PMBOK / PMI methodology and the formats, indices and scales established in DIRECTIVE No. 012-2017-OSCE/CD influence the efficiency and usefulness of both the Entity and the contractor company; developing three phases: data collection, data analysis and preparation of the results report. In the data collection stage, a copy of the technical file in digital version of the case study ““Installation of the Potable Water and Sanitary Sewerage System in Sectors Virgen del Socorro, Víctor Raúl, Sol““ will be requested from the District Municipality of La Esperanza. Naciente y Aledaños – District of La Esperanza and Huanchaco – Trujillo – La Libertad”, as well as complementary documentation to develop this research work; Likewise, notebooks, questionnaires, observation sheets and a photographic camera will be used. In the data analysis stage, each of the identified risk processes will be examined, in the risk management plan of the technical file of the case study, if they have complied with the procedures established in Directive No. 012-2017 /OSCE CD and its comparison with the good practices of the PMI, from the PMBOK guide - sixth edition. In this stage, four processes will be developed: identify risks, analyze risks, plan the response to risks and assign risks. With the results obtained in the Risk Management Plan of the project under study, an improvement to the risk management methodology is proposed in the execution phase of the work. From the evaluation carried out, it was determined that the consulting team that prepared the technical file has not complied with developing the risks ix established in numeral 7.2 of Directive No. 012-2017-OSCE/CD, for which it is proposed, in addition to compliance with the Directive, apply a Risk Management Process, which contains as input elements all the historical and technical information and studies carried out