Bibliographic citations
Mas, A., (2023). Aplicación de la metodología Last Planner System en el mejoramiento de la productividad de la construcción de la institución educativa N° 776591 Porvenir – Trujillo [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/10159
Mas, A., Aplicación de la metodología Last Planner System en el mejoramiento de la productividad de la construcción de la institución educativa N° 776591 Porvenir – Trujillo [Tesis]. PE: Universidad Privada Antenor Orrego; 2023. https://hdl.handle.net/20.500.12759/10159
@misc{renati/1344951,
title = "Aplicación de la metodología Last Planner System en el mejoramiento de la productividad de la construcción de la institución educativa N° 776591 Porvenir – Trujillo",
author = "Mas Yoplac, Ana Rosa",
publisher = "Universidad Privada Antenor Orrego",
year = "2023"
}
Given the conventional management system that is developed in the execution of works, various types of inconveniences were denoted which impede the optimal development of the construction of works, which is why this analysis focuses on improving productivity through the Last Planner System methodology in the Educational Institution enrolled in AA, HH. Alto Trujillo Barrio 6a with Local code No. 776591 in the district of El Porvenir. It began by defining the construction processes of the items of structures and at the same time classifying the works by productive work, contributory work and non-contributory work, since with this we will discover and analyze the difficulties presented to develop a good work on site. Subsequently, through the principles of the Last Planner system, the project to be analyzed was sectorized, the train of activities, master plan, LookAHead Planning and Weekly Planning were organized to obtain a general planning that allows us to visualize all the items throughout of 10 months with the main purpose of controlling the production unit for continuous improvement, thus obtaining an increase in the productivity of the execution of work; the project is included in the intermediate plans and weekly plans that allowed us to control the production units Everything analyzed has the purpose of improving the development of the activities of the Educational Institution enrolled in AA, HH. Alto Trujillo Barrio 6a with Local code No. 776591 in the district of El Porvenir, for which it was obtained that the Productive Time (TP) 42%, Contributory Time (TC) 47% and Non-Contributory Time (TNC) 11% which indicates that on average 15 days it took to carry out the construction of the institution in a conventional manner, meanwhile, with the proposal initially raised, the improvement of productivity would be achieved in 11 days by taking the construction of the same. Concluding in this way, that the applied methodology that the proposed system benefited in the aspect of time and cost, thus achieving a higher productivity performance in the construction of the Educational Institution