Isla, M., (2025). Ausencia de control simultáneo efectivo en las contrataciones de obras públicas y la vulneración al Principio de Integridad de los funcionarios de la Municipalidad Distrital de Huanchaco, año 2022 [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/56911
Isla, M., Ausencia de control simultáneo efectivo en las contrataciones de obras públicas y la vulneración al Principio de Integridad de los funcionarios de la Municipalidad Distrital de Huanchaco, año 2022 [Tesis]. PE: Universidad Privada Antenor Orrego; 2025. https://hdl.handle.net/20.500.12759/56911
@misc{renati/1337465,
title = "Ausencia de control simultáneo efectivo en las contrataciones de obras públicas y la vulneración al Principio de Integridad de los funcionarios de la Municipalidad Distrital de Huanchaco, año 2022",
author = "Isla Vargas, Marco Antonio",
publisher = "Universidad Privada Antenor Orrego",
year = "2025"
}
The purpose of this research work is to determine the absence of effective simultaneous control and its subsequent negative impact on public works contracting – and in general – violating the principle of integrity, contemplated in Article 2, literal “j” of the State Procurement Law – Law No. 30225. Without adequate control, there is a greater risk of corruption and misappropriation of public funds. When there is no effective simultaneous control reflected in all possible instances, the door is opened to fraudulent practices, such as bribery, collusion and favoritism towards certain contractors; and this can result in the assignment of contracts to companies that do not meet the necessary requirements or that offer low quality services. To guarantee integrity in public works contracting, it is essential to establish effective control mechanisms that allow constant and rigorous supervision of the contracting processes. This includes the participation of independent control bodies, the implementation of audit systems and the promotion of transparency in all stages of the process. In this way, responsible and ethical management of public resources destined for public works can be ensured. For the application of this work, the type of study applied and focused on the descriptive level was used, thus using a minimum population of six officials of the District Municipality of Huanchaco, as well as the Specific Control Reports issued during the years 2022 – 2023, obtaining results through the ""interview"" technique, which exists In fact, the absence of a strengthened control system in order to improve the image of state contracting and that without cooperative work of the institutions immersed in the problem, irregularities and the various modalities of inefficient simultaneous control service will continue in increase