Look-up in Google Scholar
Title: DISEÑO DE UN PLAN DE SEGURIDAD PARA MINIMIZAR ACCIDENTES DE TRABAJOS EN ALTURA MEDIANTE EL CÍRCULO DE DEMING Y LA VISIÓN POR COMPUTADORA EN LA CONSTRUCCIÓN DE EDIFICACIONES EN LIMA-METROPOLITANA
Other Titles: DESIGN OF A SAFETY PLAN TO MINIMIZE ACCIDENTS IN WORK AT HEIGHTS USING THE DEMING CIRCLE AND COMPUTER VISION IN THE CONSTRUCTION OF BUILDINGS IN LIMA-METROPOLITAN LIMA.
OCDE field: https://purl.org/pe-repo/ocde/ford#2.01.01; https://purl.org/pe-repo/ocde/ford#2.00.00
Issue Date: 9-Oct-2024
Institution: Universidad Peruana de Ciencias Aplicadas (UPC)
Abstract: La ​Organización Internacional del Trabajo (OIT, 2021)​ informa que aproximadamente 2 millones de personas mueren en accidentes. En Perú, se registraron 3,433 accidentes en la construcción durante el 2021. La investigación presenta un plan de seguridad basado en el ciclo Deming (PHVA) y la visión por computadora para reducir los accidentes de caídas de altura en la construcción. El ciclo consta de cuatro fases: Planificar, Hacer, Verificar y Actuar. En la fase de Planificar, se establecen metas y riesgos asociados con las caídas de altura. En la fase de Hacer, se ejecuta el plan de seguridad, implementando la visión por computadora y cumpliendo con las medidas de seguridad y promoviendo prácticas seguras. En la fase de Verificar, se evalúan los resultados recopilando datos sobre accidentes, y mejoras en la seguridad. En la fase de Actuar, se toman acciones basadas en los resultados. Los resultados de otras investigaciones, como la red neuronal que logra un 90,42% en segmentación de imágenes y un modelo de detección en tiempo real alcanzando un 85,48% en detección de comportamientos peligrosos. Además, el plan de seguridad basado en el ciclo de Deming y la visión por computadora propuesto obtuvo un 96.13% de eficacia según expertos en seguridad. En resumen, el plan de seguridad basado en el ciclo Deming y visión por computador es efectivo para mejorar la seguridad en la construcción, pero se necesita un compromiso constante de todas las partes involucradas para garantizar un entorno laboral más seguro y proteger a los trabajadores.

The ​OIT (2021)​ reports that approximately 2 million people die in accidents. In Peru, 3,433 construction accidents were recorded in 2021. The research presents a safety plan based on the Deming cycle (PHVA) and computer vision to reduce fall from height accidents on construction scaffolds. The cycle consists of four phases: Plan, Do, Check and Act. In the Plan phase, clear goals and objectives are established, and risks associated with falls from height are identified. In the Do phase, the safety plan is executed, implementing the computer vision and complying with safety measures, and promoting safe practices. In the Verify phase, the results are evaluated by collecting data on accidents and safety improvements. In the Act phase, actions are taken based on the results. The results of other research, such as the neural network achieving 90.42% in image segmentation and a real-time detection model achieving 85.48% in detecting dangerous behavior. In addition, the security plan based on the proposed Deming cycle and computer vision achieved 92.27% effectiveness according to security experts. In summary, the safety plan based on the Deming cycle is effective in improving construction safety, but a constant commitment from all parties involved is needed to ensure a safer work environment and protect workers, as well as improve the overall quality of the company.
Discipline: Ingeniería Civil
Grade or title grantor: Universidad Peruana de Ciencias Aplicadas (UPC). Facultad de Ingeniería
Grade or title: Ingeniero Civil
Juror: Rodriguez Dionisio, Sandra; Huerta Campos, Carlos; Rodriguez Barboza, José Ulises
Register date: 12-Dec-2024



This item is licensed under a Creative Commons License Creative Commons