Bibliographic citations
This is an automatically generated citacion. Modify it if you see fit
Campoverde, V., Salas, L. (2022). Control de la productividad en obras aplicando la metodología BIM, Tarapoto 2021 [Tesis, Universidad Científica del Perú]. http://hdl.handle.net/20.500.14503/2338
Campoverde, V., Salas, L. Control de la productividad en obras aplicando la metodología BIM, Tarapoto 2021 [Tesis]. PE: Universidad Científica del Perú; 2022. http://hdl.handle.net/20.500.14503/2338
@misc{renati/1038608,
title = "Control de la productividad en obras aplicando la metodología BIM, Tarapoto 2021",
author = "Salas Saavedra, Levi",
publisher = "Universidad Científica del Perú",
year = "2022"
}
Title: Control de la productividad en obras aplicando la metodología BIM, Tarapoto 2021
Authors(s): Campoverde Flores, Víctor Raúl; Salas Saavedra, Levi
Advisor(s): Samamé Zatta, Victor Eduardo
Keywords: Metodología Bim,; Método Tradicional; Costo de Obra; Tiempo y Ejecución de Obra; Productividad; Bim Methodology; Traditional Method; Cost of Work; Time and Execution of Work; Productivity
OCDE field: https://purl.org/pe-repo/ocde/ford#2.01.00
Issue Date: 10-Nov-2022
Institution: Universidad Científica del Perú
Abstract: La presente investigación está enfocada en el control de la Productividad en obras Aplicando la Metodología BIM (Buliding Information Modeling) el uso de la tecnología para desarrollar diferentes trabajos, actividades y procesos es más recurrente. El BIM ha surgido como una metodología que permite modelar en tres dimensiones y gestionar un proyecto con la finalidad de optimizar los procesos.
En el Perú, la implementación de la metodología BIM ha sido de menor a mayor escala. Se comenzó a usar para realizar modelos en tres dimensiones para presentaciones de venta. Posteriormente, se vio el potencial y se comenzó a realizar los recorridos en la etapa de planificación para la elaboración de la ingeniería y en la etapa de ejecución para poder entender los procedimientos constructivos en función de cómo quedaría terminado. Hoy en día se usa para poder gestionar proyectos en etapas tempranas y para poder controlar la obra.
Los reportes asociados a cada propiedad del elemento simplifican múltiples trabajos. Razón que, permiten ahorrar tiempo en la ejecución de diversas tareas, actividades y procesos. La metodología BIM es algo novedoso que ha empezado a desarrollarse a detalle y en conjunto nuevas herramientas genera múltiples oportunidades de mejora.
El presente trabajo de investigación ha desarrollado la aplicación de la metodología BIM para la etapa de planificación y control de obra bajo lineamientos. La aplicación de la metodología comienza con un fin netamente para el uso de verificación en obra del diseño y los procesos constructivos
This research is focused on the control of Productivity in works Applying the Bim Methodology, the use of technology to develop different jobs, activities and processes is more recurrent. BIM (Buliding Information Modeling) has emerged as a methodology that allows modeling in three dimensions and managing a project in order to optimize processes. In Peru, the implementation of the BIM methodology has been from smaller to larger scale. It began to be used to make three-dimensional models for sales presentations. Subsequently, the potential was seen and the tours began in the planning stage for the development of the engineering and in the execution stage in order to understand the construction procedures based on how it would be finished. Nowadays it is used to be able to manage projects in early stages and to be able to control the work. Reports associated with each element property simplify multiple jobs. Reason that, allow to save time in the execution of diverse tasks, activities and processes. The BIM methodology is something new that has begun to be developed in detail and as a whole new tools generate multiple opportunities for improvement. This research work has developed the application of the BIM methodology for the planning and control stage of the work under guidelines. The application of the methodology begins with a clear purpose for the use of on-site verification of the design and construction processes.
This research is focused on the control of Productivity in works Applying the Bim Methodology, the use of technology to develop different jobs, activities and processes is more recurrent. BIM (Buliding Information Modeling) has emerged as a methodology that allows modeling in three dimensions and managing a project in order to optimize processes. In Peru, the implementation of the BIM methodology has been from smaller to larger scale. It began to be used to make three-dimensional models for sales presentations. Subsequently, the potential was seen and the tours began in the planning stage for the development of the engineering and in the execution stage in order to understand the construction procedures based on how it would be finished. Nowadays it is used to be able to manage projects in early stages and to be able to control the work. Reports associated with each element property simplify multiple jobs. Reason that, allow to save time in the execution of diverse tasks, activities and processes. The BIM methodology is something new that has begun to be developed in detail and as a whole new tools generate multiple opportunities for improvement. This research work has developed the application of the BIM methodology for the planning and control stage of the work under guidelines. The application of the methodology begins with a clear purpose for the use of on-site verification of the design and construction processes.
Link to repository: http://hdl.handle.net/20.500.14503/2338
Discipline: Ingeniería Civil
Grade or title grantor: Universidad Científica del Perú. Facultad de Ciencias e Ingeniería
Grade or title: Ingeniero Civil
Juror: Padilla Maldonado, Joel; Cuzco Trigozo, Luis Armando; Ríos Vargas, Caleb
Register date: 13-Apr-2023
This item is licensed under a Creative Commons License