Bibliographic citations
Espinosa, O., (2014). Estudio de pre factiblidad para la implementación de una empresa productora y exportadora de tara en polvo para la región de Lombardía, Italia ubicada en el departamento de La Libertad [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/6350
Espinosa, O., Estudio de pre factiblidad para la implementación de una empresa productora y exportadora de tara en polvo para la región de Lombardía, Italia ubicada en el departamento de La Libertad [Tesis]. PE: Universidad Privada del Norte; 2014. https://hdl.handle.net/11537/6350
@misc{sunedu/3002660,
title = "Estudio de pre factiblidad para la implementación de una empresa productora y exportadora de tara en polvo para la región de Lombardía, Italia ubicada en el departamento de La Libertad",
author = "Espinosa Ramírez, Olinda Alexandra",
publisher = "Universidad Privada del Norte",
year = "2014"
}
ABSTRACT This business idea refers to processing and selling Tara Powder for the Lombardía region market in Italy, which is the main consumption area from natural ice creams that use it as a stabilizer. Because of this, a production plant will be installed in La Libertad that should be supplied from nearby provinces with raw material. The Tara Powder will be sold in bags; it uses as its main raw material the Tara Pods. These are collected, dried, selected and threshed; there is a separation from the fiber with the seed and finally the milling process to get micronized powder. These are put into polypropylene bags and prepared to export to the Lombardía Region in Italy. The target market includes the organic alimentary distributors which sell manufacturers, the stabilizers they need at the Lombardía Region in Italy. The positioning is defined by the following factors: - Specific benefits of the product considering that it is organic. - The importance of international certification that it is exclusive for export. The total investment is composed in 80% by 2 investors and in 20 % by a bank loan. This Project requires a total investment of S/. 438,922 divided as follows: - Long term assets: S/. 313,294 - Intangible Assets: S/. 21,749 - Working Capital: S/. 103,879 It is also considered to have 5 investors without the need to get the bank loan. We are considering 5 years as the Project timeline (Jan-15 to Dec-19) to start the operations. We will also need one year at first which is enough to cover the formulation, market revision, economic, technical, financial evaluations and the Project investment. The Project is considered acceptable given its profitability indicators with a VAN of S/. 704,967.00 and an IRR of 36.63 %. Considering this, it has a payback period of 4 years and 1 month.
This item is licensed under a Creative Commons License