Citas bibligráficas
Gamarra, O., (2016). Propuesta de mejora para el sistema de gestión de seguridad, en la ampliación de la planta de tratamiento de aguas residuales de la E.P.S. Sedacusco - 2013. [Tesis, Universidad Andina del Cusco]. https://hdl.handle.net/20.500.12557/756
Gamarra, O., Propuesta de mejora para el sistema de gestión de seguridad, en la ampliación de la planta de tratamiento de aguas residuales de la E.P.S. Sedacusco - 2013. [Tesis]. : Universidad Andina del Cusco; 2016. https://hdl.handle.net/20.500.12557/756
@misc{renati/955641,
title = "Propuesta de mejora para el sistema de gestión de seguridad, en la ampliación de la planta de tratamiento de aguas residuales de la E.P.S. Sedacusco - 2013.",
author = "Gamarra Gómez, Othniel Edmundo",
publisher = "Universidad Andina del Cusco",
year = "2016"
}
This research anims to diagnose and an improvement proposalfor SGSSO in expanding the EPS SEDACUSCO WWTP. For this, start by identifying the problem, its importance, justification and objectives to follow to reach what will be the improvement proposal itself. Next, the background of the study, with the practical information regarding reflected in thesis addressed similar issues are discussed; and theoretical, reflected in the intellectual creations that we use as part of the framework, but also a description of the business is done, the work done, the field which is engaged and the work being developed in the construction was implemented in Treatment Plant Wastewater EPS SEDACUSCO, these being part construction and rehabilitation of buildings, complementary and work to be performed during the execution of the project works. Thes amechapterthe legal framework, decrees, rules and laws that give parameters to this thesis variables and indicators are also shown also addresses. Subsequently it defines there search design, population and sample to develop the proposalt improve the SGSSO. In the fourth chapter, the situation alanalysis of the safety management system is developed, conducting an assessment and grab the SGS verifies compliance with he objectives; as well as the respective analysis of the data collected. In the fifthchapter, the proposed improvements to the Safety Management System in the construction and expansion of treatmentplantwaste water EPS SEDACUSCO develops. Finally, the result of analys is based on the data obtained as conclusions and in thes a me way expresses the respective recommendations are given.
IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.