Ariza, V., (2021). Implementación de la gestión de riesgos en un proyecto de infraestructura vial ubicado en la región Pasco durante la etapa de ejecución de obra [Universidad Tecnológica del Perú]. https://hdl.handle.net/20.500.12867/5213
Ariza, V., Implementación de la gestión de riesgos en un proyecto de infraestructura vial ubicado en la región Pasco durante la etapa de ejecución de obra []. PE: Universidad Tecnológica del Perú; 2021. https://hdl.handle.net/20.500.12867/5213
@mastersthesis{renati/811852,
title = "Implementación de la gestión de riesgos en un proyecto de infraestructura vial ubicado en la región Pasco durante la etapa de ejecución de obra",
author = "Ariza Flores, Victor Andre",
publisher = "Universidad Tecnológica del Perú",
year = "2021"
}
The present research study focuses as a general objective to implement risk management in a road infrastructure construction project in the work execution stage. For this, it has been required to collect all the existing information regarding: (i) the technical and legal framework with which risk management is developed based on the procurement regulations, Directives of the State Procurement Supervisory Agency - OSCE, as well as various case studies conducted both internationally and nationally. Therefore, the specific objectives begin with the description of the technical and legal framework available in the country for risk management and, based on this, develop a methodology to implement risk management and identify which aspects can be improved in the application of risk management. In application of the above, this research study takes as a sample the Work "Improvement of the Oyón to Ambo National Highway, sector 2" located in the Pasco region in Peru. The client of this project is Provias Nacional, the contractor is the Consorcio Carretero del Perú, made up of two companies: a Chinese company whose name is CHINA GEZHOUBA GROUP COMPANY PERÚ and a Peruvian company named EIVISAC. The Supervision of the Work is developed by the company CONSORCIO SUPERVISOR OYÓN CHACAYÁN. The work consists of the construction of a 50-kilometer rigid pavement highway and 9 reinforced concrete bridges whose cumulative length is 145 meters. The methodology used in this research work corresponds to a qualitative approach; likewise, the scope is of the correlational descriptive type and the design of the work is non-experimental.