Bibliographic citations
Montalvo, E., (2021). Aplicación de la tecnología BIM a la gestión de prevención de riesgos laborales en el proyecto Cocina Industrial - Arequipa 2020 [Universidad Tecnológica del Perú]. https://hdl.handle.net/20.500.12867/4135
Montalvo, E., Aplicación de la tecnología BIM a la gestión de prevención de riesgos laborales en el proyecto Cocina Industrial - Arequipa 2020 []. PE: Universidad Tecnológica del Perú; 2021. https://hdl.handle.net/20.500.12867/4135
@misc{renati/811844,
title = "Aplicación de la tecnología BIM a la gestión de prevención de riesgos laborales en el proyecto Cocina Industrial - Arequipa 2020",
author = "Montalvo Alvarez, Erland Lindon",
publisher = "Universidad Tecnológica del Perú",
year = "2021"
}
Currently, the construction sector is one of the sectors with the highest number of occupational accidents according to reports made by the Ministry of Labor and Employment Promotion. The present research consisted of applying BIM technology in the management of occupational risks of the Industrial Kitchen project executed by the company CONSTRUCTORA BELECAN ASOCIADOS S.R.L. that allow minimizing risks at work during the design phase. This research begins with the management and analysis of architectural plans of the Industrial Kitchen project, second the execution of modeling with the Revit tool, third defining a work planning using the Ms Project tool, fourth the identification and risk assessment of each phase is carried out of work, fifth preventive measures are proposed, sixth study and budget management for risk management in the aforementioned project, seventh creation of 4D model for field simulations with the Navisworks tool, eighth the risks are reevaluated after the measures introduced. Finally, the deviation indices are analyzed to assess the impact of BIM technology on the Industrial Kitchen project. It is concluded that the correct use of B.I.M technology in risk management during the design phase of the project minimizes labor risks, improvisations in the field and increases in the established budget.
This item is licensed under a Creative Commons License