Castillo, N., (2024). Informe Jurídico sobre el Laudo Arbitral de fecha 1 de diciembre de 2015 recaído en el Caso Arbitral N° 2728- 2013-CCL [Pontificia Universidad Católica del Perú]. http://hdl.handle.net/20.500.12404/28392
Castillo, N., Informe Jurídico sobre el Laudo Arbitral de fecha 1 de diciembre de 2015 recaído en el Caso Arbitral N° 2728- 2013-CCL []. PE: Pontificia Universidad Católica del Perú; 2024. http://hdl.handle.net/20.500.12404/28392
@misc{renati/539348,
title = "Informe Jurídico sobre el Laudo Arbitral de fecha 1 de diciembre de 2015 recaído en el Caso Arbitral N° 2728- 2013-CCL",
author = "Castillo Santillana, Nicol Brigith",
publisher = "Pontificia Universidad Católica del Perú",
year = "2024"
}
This paper deals with the consequences of the late delivery of land in favor of the contractor in the framework of the public works for the improvement of Néstor Gambetta Avenue in Callao, and how such a situation can cause the breach of the economic and financial equilibrium of the contract (EEC). The aforementioned scenario, common in public contracts, was the case of the Regional Government of Callao and the Nueva Gambetta Consortium, which is why the latter resorted to arbitration to claim the various extensions of time, direct costs and higher variable overheads denied by the entity. Against this background, the Arbitral Tribunal, by means of the Award in Arbitration Case No. 2728-2013-CCL, ruled in favor of the claims raised by the Contractor, with the exception of the direct costs, to which it applied discounts. Based on the above, it will be analyzed what kind of obligation constitutes the delivery of land that allows to take a position on such claims and to determine whether the Contractor has indeed suffered a breach of the financial equilibrium of the contract that has not been restored in the arbitration proceedings. The conditions to be met in the EEC are also examined.