Martell, P. R. (2017). Optimización de costos mediante la implementación de una construcción pre fabricada en el proceso constructivo de las obras civiles de una subestación compacta bóveda subterránea en la empresa Lilestrom S.A.C (Tesis de licenciatura). Recuperado de http://hdl.handle.net/11537/11408 (es_PE)
670.42 MART 2017 (es_PE)
https://hdl.handle.net/11537/11408
RESUMEN La presente investigación tiene como finalidad la optimización de costos y minimizar tiempos mediante la presentación de un nuevo proceso que es el sistema pre fabricado, realizado en la empresa LILESTROM S.A.C. para un proceso constructivo de obras civiles de una subestación compacta bóveda subterránea en la ciudad de Lima. Tomando registros de otras tesis con el sistema pre fabricado en distintas construcciones, se reveló que este sistema es muy usado en países desarrollados y en vía de desarrollo por los grandes beneficios de tipo económico, la creación de nuevas tecnologías para su construcción y la apertura para nuevos mercados. En Lima las construcciones de las subestaciones compactas bóvedas subterráneas ejecutadas por las contratitas de la empresa ENEL antes con nombre EDELNOR S.A. son realizadas de forma tradicional es decir in situ debido al diseño del cliente, para este nuevo sistema de construcción se aumentarán los anclajes para los muros, la aplicación de un material impermeable como sistema de seguridad ante filtraciones de agua, transporte de bloques de concreto como producto pre fabricado y su instalación con máquinas apropiadas, ya que los cálculos de pesos de bloques es parte de la investigación. Los procesos, cronogramas, presupuesto de mano de obra sustentado por el análisis de precios unitarios (APU), la curvas “S” , diagramas de operaciones y procesos (DOP) y el diagrama Ishikawa serán mostrados por el estudio realizado, comparando los tipos el sistema tradicional contra el pre fabricado, de esta manera se resolverán los objetivos específicos presentados. Para finalizar se presentará mediante gráficos de los beneficios cuantitativos explicado en unidades monetarias y mencionará los beneficios cualitativos, para concluir esta investigación dará inicio a futuras investigaciones que desean construir de modo pre fabricado dirigido al mercado eléctrico. PALABRAS CLAVE: construcción pre fabricado y subestaciones pre fabricado. (es_PE)
ABSTRACT The present research aims at optimizing costs and minimizing time by presenting a new process that is the pre-fabricated system, made in the company LILESTROM S.A.C. For a construction process of civil works of a compact substation in a vault in the city of lima. Taking records of other theses. It was revealed that this system is widely used in developed countries, due to the great economic benefits, the creation of new technologies for its construction and the opening for new markets. In Lima, the constructions of the compact substations of underground vaults are executed by the company ENEL, which was called EDELNOR S.A. before. They are performed in a traditional way. That is, in situ, due to the customer's design. For this new design the wall anchors will be increased, the application of impermeable material as a security system to prevent water filtrations, transport of concrete blocks as a product pre-fabricated and its installation with appropriate machines; Since the calculation of block weights is part of the investigation. The processes, schedules, budgets are supported by the unit price analysis (APU), the "S" curve and the Ishikawa diagram, they will be shown by the study done, comparing the types of traditional systems against the pre fabricated. This will solve the specific objectives presented. Finally, the quantitative benefits explained in monetary units and will be presented by graphics. Also, the qualitative benefits will be mentioned. In conclusion, this research will initiate future researches that wish to build in a pre-fabricated way to the electric market. KEYWORDS: pre-fabricated construction and pre-fabricated substations. (es_PE)
Tesis (es_PE)
application/pdf (es_PE)
application/msword (es_PE)
spa (es_PE)
Universidad Privada del Norte (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
https://creativecommons.org/licenses/by-nc-sa/3.0/us/ (*)
Universidad Privada del Norte (es_PE)
Repositorio Institucional - UPN (es_PE)
Control de procesos informatizado (es_PE)
Análisis de costos (es_PE)
Gestión de la construcción (es_PE)
Costos de construcción (es_PE)
Optimización de costos mediante la implementación de una construcción pre fabricada en el proceso constructivo de las obras civiles de una subestación compacta bóveda subterránea en la empresa Lilestrom S.A.C (es_PE)
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Privada del Norte. Facultad de Ingeniería (es_PE)
Ingeniería Industrial (es_PE)
Título Profesional (es_PE)
Ingeniero Industrial (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.11.04 (es_PE)
Pregrado (es_PE)
https://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
09634918
42737092
722026 (es_PE)
Bravo Orellana, Miriam
Piscoya Silva, Ulises
Colonio Garcia, Luis
https://purl.org/pe-repo/renati/type#tesis (es_PE)
Privada societaria



This item is licensed under a Creative Commons License Creative Commons